Back to bathroom remodel contractors
Lynagh Construction
- Based in
- San Carlos
- On San Francisco permits
- Aug 2000 to Jan 2008
- Last 24 months
- 0 permits filed
57 permits since 2000: 40 completed, 4 never finaled, 13 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2006 | Completed final sign-off Apr 2007 | 4012 Judah St | shower install in basement (no structural) bathroom. add light light/fan with vent.Details
shower install in basement (no structural) bathroom. add light light/fan with vent. | $5,000 |
| Oct 26, 2006 | Completed final sign-off Apr 2007 | 5084 Diamond Heights Bl | install new shower heads, faucets, & replace vanity cabinets in bathroom. slight alterations on drain at vanity & at water lines replace light fixture & switches in bathroom. remove & reset toilet in same location. no structural. no changes to partitions or window.Details
install new shower heads, faucets, & replace vanity cabinets in bathroom. slight alterations on drain at vanity & at water lines replace light fixture & switches in bathroom. remove & reset toilet in same location. no structural. no changes to partitions or window. | $8,500 |
| May 23, 2006 | Expired or cancelled expired Dec 2006 | 1319 Ortega St | replace dry wall & fixtures in res. bathroom (remodel bathroom (e), showers, heads, toilet, vanity cabinet replacement. install light fixture, new switches, gcfi - no structuralDetails
replace dry wall & fixtures in res. bathroom (remodel bathroom (e), showers, heads, toilet, vanity cabinet replacement. install light fixture, new switches, gcfi - no structural | $10,000 |