Back to bathroom remodel contractors
Luxury Construction Llc
- Based in
- Pinole
- On San Francisco permits
- Mar 2022 to Mar 2026
- Last 24 months
- 7 permits filed
20 permits since 2000: 19 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 1
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 3 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2026 | Completed final sign-off Nov 2026 | 234 10th Av | 3rd fl horizontal expansion at the rear. adding approximately 195 square foot on l3. new bathroom at 1st fl.Details
3rd fl horizontal expansion at the rear. adding approximately 195 square foot on l3. new bathroom at 1st fl. | $75,000 |
| May 9, 2025 | Completed final sign-off Feb 2026 | 2023 21st Av | remodel kitchen and bathroom - replace finishes and plumbing fixtures - no moving of walls; refinsh hardwood floor within home and replace (2) windows at rear of house only -in kind to meet egress reqs.Details
remodel kitchen and bathroom - replace finishes and plumbing fixtures - no moving of walls; refinsh hardwood floor within home and replace (2) windows at rear of house only -in kind to meet egress reqs. | $48,000 |
| Apr 16, 2025 | Completed final sign-off Jul 2025 | 423 Lansdale Av | remodel bathroom, replace shower, new vanity, replace window and replace 3 skylights. replace everything in same place, in-kindDetails
remodel bathroom, replace shower, new vanity, replace window and replace 3 skylights. replace everything in same place, in-kind | $25,000 |
| Mar 29, 2024 | Completed final sign-off Oct 2024 | 1325 Holloway Av | new bathroom on 2/f with window (not visible from street), remodel 2 closets.Details
new bathroom on 2/f with window (not visible from street), remodel 2 closets. | $37,000 |
| Mar 7, 2022 | Completed final sign-off May 2022 | 1013 Clayton St | remodel downstairs bathroom. new bathtub, new sink, & new toilet in same location.Details
remodel downstairs bathroom. new bathtub, new sink, & new toilet in same location. | $15,000 |