Back to bathroom remodel contractors
Lushov Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2013 to Jun 2026
- Last 24 months
- 1 permit filed
17 permits since 2000: 9 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 637 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 24, 2026 | Completed final sign-off Sep 2026 | 1447 33rd Av | bathroom remodel: replace shower, tile and vanity and faucet in-kind. replace window in lightwell. replace tile floorDetails
bathroom remodel: replace shower, tile and vanity and faucet in-kind. replace window in lightwell. replace tile floor | $19,900 |
| Apr 5, 2016 | Never finaled issued Apr 2016, no final | 626 Spruce St | 2nd floor deck @ rear of house deck paint. fix plumbing on 1st fl bathroom & outlets, lights, fan & smoke detector.Details
2nd floor deck @ rear of house deck paint. fix plumbing on 1st fl bathroom & outlets, lights, fan & smoke detector. | $6,000 |
| Feb 20, 2015 | Expired or cancelled expired Mar 2026 | 626 Spruce St | interior remodel @ 1st floor rear to include foundation replacement, infill of door @ (e) bath to allow for new shower, reconfigure steps to bedroom & remove non-bearing walls.Details
interior remodel @ 1st floor rear to include foundation replacement, infill of door @ (e) bath to allow for new shower, reconfigure steps to bedroom & remove non-bearing walls. | $50,000 |
| Dec 31, 2014 | Completed final sign-off May 2018 | 366 Los Palmos Dr | create living space at garage level: add new bathroom and new bedroom. renovate kitchen, replace extg windows of west facade facing rear yard, new skylight. replace fixutres and tile at extg bath.front windows to be wood clad.Details
create living space at garage level: add new bathroom and new bedroom. renovate kitchen, replace extg windows of west facade facing rear yard, new skylight. replace fixutres and tile at extg bath.front windows to be wood clad. | $45,000 |