Lunar Associates
- Based in
- Dc
- On San Francisco permits
- Oct 2007 to Oct 2007
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 26, 2007 | Completed final sign-off Feb 2008 | 930 Vienna St | demo of (e) cabinets & re-install (n) cabinets with granite top, add 3 electrical outlets and install flourscent lights. add new electrical panel box (100 amps), paint kitchen and re-finish old flooring. move gas lines and exhaust pipeDetails
demo of (e) cabinets & re-install (n) cabinets with granite top, add 3 electrical outlets and install flourscent lights. add new electrical panel box (100 amps), paint kitchen and re-finish old flooring. move gas lines and exhaust pipe | $18,000 |