Luna Construction
- Based in
- San Mateo
- On San Francisco permits
- Jan 2022 to Jul 2025
- Last 24 months
- 3 permits filed
6 permits since 2000: 5 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2025 | Completed final sign-off Dec 2025 | 446 27th St | 2nd floor: bathroom remodel, in kind, vanity, counter top, bath tub, shower. new electrical and plumbing fixtures.Details
2nd floor: bathroom remodel, in kind, vanity, counter top, bath tub, shower. new electrical and plumbing fixtures. | $80,000 |
| Jan 10, 2025 | Completed final sign-off May 2025 | 61 Burlwood Dr | entry way remodel, relocate and reframe existing closet, new handrail, and balusters, new tile floor, and insulate and sheetrock garage area. upgrade electrical outlets and lights.Details
entry way remodel, relocate and reframe existing closet, new handrail, and balusters, new tile floor, and insulate and sheetrock garage area. upgrade electrical outlets and lights. | $60,000 |
| Oct 25, 2024 | In progress issued Oct 2024 | 83 Woodland Av | front stairs dry rot and water damage repair. in kind repair.Details
front stairs dry rot and water damage repair. in kind repair. | $7,500 |
| May 16, 2024 | Completed final sign-off Nov 2024 | 70 Woodland Av | 2nd fl bathroom remodel. replacement og 1 bathtub, 1 toilet, 1 sink, 2 double hung windows (on the side), new plumbing & new electrical fixtures.Details
2nd fl bathroom remodel. replacement og 1 bathtub, 1 toilet, 1 sink, 2 double hung windows (on the side), new plumbing & new electrical fixtures. | $50,000 |
| Jun 16, 2023 | Completed final sign-off Feb 2024 | 61 Burlwood Dr | ll: replace existing bar area with laundry, remodel existing bathroom, extend shower wall into the garage; ul: remodel existing bathroom, install 1-new skylight, replace 1-window.Details
ll: replace existing bar area with laundry, remodel existing bathroom, extend shower wall into the garage; ul: remodel existing bathroom, install 1-new skylight, replace 1-window. | $180,000 |
| Jan 28, 2022 | Completed final sign-off Feb 2022 | 66 Woodland Av | dry rot repair, replacing rotted deck boards. less than 50%Details
dry rot repair, replacing rotted deck boards. less than 50% | $3,000 |