Back to bathroom remodel contractors
Lowe Ernie & Sons Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2002 to Feb 2014
- Last 24 months
- 0 permits filed
21 permits since 2000: 16 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2013 | Completed final sign-off Jun 2014 | 270 Ashton Av | tenant improvement to renovate the existing accessible bathroom & to replace "in-kind" exterior windows.Details
tenant improvement to renovate the existing accessible bathroom & to replace "in-kind" exterior windows. | $100,000 |
| Feb 22, 2008 | Completed final sign-off May 2008 | 885 University St | update outlets at kitchen counter, change counter top, appliances, bath: tub, tile at upper bath, change windows-front & rear-same in kind as existing. no demo of walls framing. (7 windows total)Details
update outlets at kitchen counter, change counter top, appliances, bath: tub, tile at upper bath, change windows-front & rear-same in kind as existing. no demo of walls framing. (7 windows total) | $20,000 |
| Oct 15, 2007 | Completed final sign-off Mar 2008 | 635 Paris St | change plumbing fixtures and piping (bathrom remodel) change knob and tube wiring 2/f sheetrocking 2/f no change to framing bathroom bedrooms 2/f lighting will comply with t-24Details
change plumbing fixtures and piping (bathrom remodel) change knob and tube wiring 2/f sheetrocking 2/f no change to framing bathroom bedrooms 2/f lighting will comply with t-24 | $20,000 |