Back to bathroom remodel contractors
Loughville Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Mar 2017
- Last 24 months
- 0 permits filed
31 permits since 2000: 28 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 2 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2017 | Completed final sign-off May 2017 | 1250 Clay St | bathroom renovation: minor plumbing, electrical, drywall and tile. no alteration of wall, window and door.Details
bathroom renovation: minor plumbing, electrical, drywall and tile. no alteration of wall, window and door. | $15,000 |
| Feb 13, 2015 | Completed final sign-off Apr 2015 | 722 Central Av | to comply with physical inspection report cc-7562. item #8: return attic space to storage area only and remove bathroom plumbing and 2 walls. attic knee walls and flat ceiling to remain. skylights to remain.Details
to comply with physical inspection report cc-7562. item #8: return attic space to storage area only and remove bathroom plumbing and 2 walls. attic knee walls and flat ceiling to remain. skylights to remain. | $15,000 |
| Nov 3, 2014 | Completed final sign-off Feb 2015 | 718 47th Av | revision to appl #2014.0829.5115 - install all (n) windows in-kind, remove glass block sidelights & small cl. window, skim coat exterior, paint int & ext, (n) h.w. floor, repair dryrot in front & rear, remodel 2-1/2 baths, (n) kitchen cabinets, refinish h.w. flooring.Details
revision to appl #2014.0829.5115 - install all (n) windows in-kind, remove glass block sidelights & small cl. window, skim coat exterior, paint int & ext, (n) h.w. floor, repair dryrot in front & rear, remodel 2-1/2 baths, (n) kitchen cabinets, refinish h.w. flooring. | $20,000 |
| Sep 10, 2008 | Completed final sign-off Jan 2009 | 2924 Diamond St | remove fireplace, remodel kitchen and bathroom, install new hardwood floor, no doors or windows to be changed. patch roof at flue location. 1 fireplace supported floor framing of 2nd fl(no structural work).Details
remove fireplace, remodel kitchen and bathroom, install new hardwood floor, no doors or windows to be changed. patch roof at flue location. 1 fireplace supported floor framing of 2nd fl(no structural work). | $25,000 |
| Aug 28, 2008 | Completed final sign-off Dec 2008 | 2922 Diamond St | remodel restaurant space to accomodate handicap bathroom & path of travel. upgrade electrical service, install new appliances. remove inadequate side stairs and fillin.Details
remodel restaurant space to accomodate handicap bathroom & path of travel. upgrade electrical service, install new appliances. remove inadequate side stairs and fillin. | $25,000 |