Back to bathroom remodel contractors
Loughran Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Mar 2026
- Last 24 months
- 5 permits filed
144 permits since 2000: 107 completed, 21 never finaled, 16 expired or cancelled.
Of the 21 never-finaled permits, 3 are 3 to 5 years old, 10 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
42 bathroom remodel permits: 35 completed, 5 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 28, 2025 | Completed final sign-off Nov 2025 | 4317 21st St | unit 3: remodel (e) bathroom. replace fixtures and tile.Details
unit 3: remodel (e) bathroom. replace fixtures and tile. | $15,000 |
| Jun 24, 2025 | Completed final sign-off Oct 2025 | 666 Carolina St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $35,000 |
| May 13, 2024 | Completed final sign-off Jul 2024 | 409 Mangels Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $11,900 |
| Sep 7, 2023 | Completed final sign-off Dec 2023 | 4378 23rd St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $15,400 |
| Jun 25, 2020 | Never finaled issued Apr 2021, no final | 275 Castro St | work to first floor unit only. expand unit down into (e) basement level to create new 2 bedroom, 2 bathroom apartment. new rear facing windows. sprinkler entire unit and first floor including garage.Details
work to first floor unit only. expand unit down into (e) basement level to create new 2 bedroom, 2 bathroom apartment. new rear facing windows. sprinkler entire unit and first floor including garage. | $150,000 |
| Mar 2, 2020 | Completed final sign-off May 2022 | 140 Taraval St | remodel 2 (e) sfd 1st fl - reconfigure bathroom, convert living room to bedrm, provide (n) conditioned space for (n) entertainment room; 2nd fl - relocate kitchen, reconfigure bathroom, convert bedroom to living room. replace (e) internal stair. replace windows at rear & side of propertyDetails
remodel 2 (e) sfd 1st fl - reconfigure bathroom, convert living room to bedrm, provide (n) conditioned space for (n) entertainment room; 2nd fl - relocate kitchen, reconfigure bathroom, convert bedroom to living room. replace (e) internal stair. replace windows at rear & side of property | $275,000 |
| Jan 6, 2020 | Completed final sign-off May 2022 | 140 Taraval St | remodeling kitchen and 2 baths at 2nd fl. no structural workDetails
remodeling kitchen and 2 baths at 2nd fl. no structural work | $37,000 |
| Apr 22, 2019 | Never finaled issued Apr 2019, no final | 3280 22nd St | unit d: remodel existing 2 bathroom. add half bathroom @ top level, hardwood floor.Details
unit d: remodel existing 2 bathroom. add half bathroom @ top level, hardwood floor. | $36,000 |
| Jul 24, 2018 | Never finaled issued Sep 2018, no final | 275 Castro St | renovation to top floor apt. relocate kitchen, reconfigure baths, replace windows and skylights at back and side of property. no work visible from street/public wayDetails
renovation to top floor apt. relocate kitchen, reconfigure baths, replace windows and skylights at back and side of property. no work visible from street/public way | $45,000 |
| May 8, 2018 | Completed final sign-off Dec 2018 | 327 Precita Av | renovation of kitchen, powder room, modify extg alcove and closet into bathroom and closet.Details
renovation of kitchen, powder room, modify extg alcove and closet into bathroom and closet. | $90,000 |
| Mar 7, 2018 | Never finaled issued Jul 2018, no final | 3465 20th St | project consists of interior alterations to the lower dwelling unit in an (e) 2 unit residential bldg including remodeled kitchen & bathroom. new finishes, heating system & lighting. work also include new appliances, water heater & furnace in garage. no exterior work. mep to be submitted as separateDetails
project consists of interior alterations to the lower dwelling unit in an (e) 2 unit residential bldg including remodeled kitchen & bathroom. new finishes, heating system & lighting. work also include new appliances, water heater & furnace in garage. no exterior work. mep to be submitted as separate | $123,933 |
| Dec 22, 2017 | Completed final sign-off Nov 2018 | 2250 Jerrold Av | unit 11: interiors only. non structural gr fl ti permit for beverage processing facility. interior improvement include new finishes, mech, elc, plumb uprades for compliance with sf dph standards for food facilities. upgrade e gr fl bath to ada compliantDetails
unit 11: interiors only. non structural gr fl ti permit for beverage processing facility. interior improvement include new finishes, mech, elc, plumb uprades for compliance with sf dph standards for food facilities. upgrade e gr fl bath to ada compliant | $30,000 |
| Oct 5, 2017 | Completed final sign-off Jan 2020 | 4130 21st St | 1/f:covert (e) storage space to bedroom. create (n) hallway from home office tobedroom spaces. epxand bathroom. renovate half-bath. add 250sf conditional space. 2/f:remodel (e) bathroom. exterior work: window replacmeent throughout home.Details
1/f:covert (e) storage space to bedroom. create (n) hallway from home office tobedroom spaces. epxand bathroom. renovate half-bath. add 250sf conditional space. 2/f:remodel (e) bathroom. exterior work: window replacmeent throughout home. | $180,000 |
| Sep 14, 2017 | Expired or cancelled expired Apr 2026 | 320 Walnut St | 1st fl renovate kitchen & bath, move partitions, new finishes, fixtures, 2nd fl open up space to reconfigure kitchen & baths, living spaces. 3rd fl reconfigure bedroom & bath spaces. new windows & doors at back of house only. no work visible from st. no add cond area, provide hydronic heat & floor.Details
1st fl renovate kitchen & bath, move partitions, new finishes, fixtures, 2nd fl open up space to reconfigure kitchen & baths, living spaces. 3rd fl reconfigure bedroom & bath spaces. new windows & doors at back of house only. no work visible from st. no add cond area, provide hydronic heat & floor. | $130,000 |
| Mar 21, 2017 | Completed final sign-off Jun 2017 | 2001 Mcallister St | remodel existing kitchen and 2 baths. no structural. n/a maherDetails
remodel existing kitchen and 2 baths. no structural. n/a maher | $41,000 |
| Mar 21, 2017 | Completed final sign-off Jun 2017 | 51 Gladys St | remodel existing kitchen and 2 baths. no structuralDetails
remodel existing kitchen and 2 baths. no structural | $20,000 |
| Jan 26, 2017 | Completed final sign-off Jan 2018 | 2867 22nd St | remodel existing kitchen and two bathrooms. no structural work.Details
remodel existing kitchen and two bathrooms. no structural work. | $61,000 |
| Jan 14, 2016 | Completed final sign-off Jun 2016 | 527 30th St | remodel (2) two (e) bathrooms. no structural.Details
remodel (2) two (e) bathrooms. no structural. | $25,500 |
| Oct 22, 2015 | Completed final sign-off May 2022 | 935 Diamond St | horizontal addition to an (e) single family residence. addition of two new dormers. replacing (e) windows in kind and re-cladding (e) exterior entry stairs. 2 new bathrooms to be added.Details
horizontal addition to an (e) single family residence. addition of two new dormers. replacing (e) windows in kind and re-cladding (e) exterior entry stairs. 2 new bathrooms to be added. | $200,000 |
| Sep 11, 2015 | Completed final sign-off Apr 2021 | 935 Diamond St | interior remodeling 1st & 2nd floors including (n) bathroom & bedroom & laundry @ 2nd floor, relocate bath, add new family room @ 1st floor. voluntary partial seismic bracing - monent frame.Details
interior remodeling 1st & 2nd floors including (n) bathroom & bedroom & laundry @ 2nd floor, relocate bath, add new family room @ 1st floor. voluntary partial seismic bracing - monent frame. | $70,000 |
| Jul 17, 2015 | Completed final sign-off Jan 2016 | 863 Guerrero St | to comply/correct w/nov #201536811 - as-built plans to legalize (e) playroom & bath @ ground floor & (e) 6' fence @ south property line.Details
to comply/correct w/nov #201536811 - as-built plans to legalize (e) playroom & bath @ ground floor & (e) 6' fence @ south property line. | $15,000 |
| Apr 8, 2015 | Completed final sign-off Jul 2015 | 4372 24th St | remodel bathroom - to comply with cec150.0(k)5Details
remodel bathroom - to comply with cec150.0(k)5 | $13,000 |
| Mar 3, 2015 | Completed final sign-off Nov 2018 | 409 29th St | alterration & rear addition to (e) single family home. extend 1st & 2nd levels to add new living spaces & master suite areas. new deck & stair to grade. new landscaping rear yard. new interior stair & kitchen & bath remodel second flr.Details
alterration & rear addition to (e) single family home. extend 1st & 2nd levels to add new living spaces & master suite areas. new deck & stair to grade. new landscaping rear yard. new interior stair & kitchen & bath remodel second flr. | $190,000 |
| Apr 25, 2014 | Completed final sign-off Apr 2015 | 1045 Sanchez St | add new dormers to existing single family. 3rd fl to include new den, office & bath. remodel 1st fl to include new bedroom. remodel 2nd fl, new stairs, new windows in dormers. new skylights in roof.Details
add new dormers to existing single family. 3rd fl to include new den, office & bath. remodel 1st fl to include new bedroom. remodel 2nd fl, new stairs, new windows in dormers. new skylights in roof. | $175,000 |
| Sep 5, 2013 | Completed final sign-off Jun 2016 | 542 Laidley St | remodel of 1 fam house, expand bldg to side prop line at all levels/expand at rear, modify roof to increase headrm at (e) living space, exterior siding, window and door upgrades. expand guest rm & utility rm on 1/f expand living rm on 2/f. expand 3 bedrms & 2 baths onDetails
remodel of 1 fam house, expand bldg to side prop line at all levels/expand at rear, modify roof to increase headrm at (e) living space, exterior siding, window and door upgrades. expand guest rm & utility rm on 1/f expand living rm on 2/f. expand 3 bedrms & 2 baths on | $350,000 |
| Feb 27, 2013 | Completed final sign-off Apr 2013 | 3345 22nd St | remodel bathroom in rear, replace shower, sink and toilet, no structural, no windows & no doors on this permit.Details
remodel bathroom in rear, replace shower, sink and toilet, no structural, no windows & no doors on this permit. | $5,500 |
| Dec 4, 2012 | Completed final sign-off Sep 2013 | 211 Douglass St | convert shop space to living at ground floor including 1 full bath, entertainment rm & office. new internal stairs to connect 1st & 2nd floor. replace some windows and doors. new rear deck at ground floor 2'-0" above grade. no increase to building envelope.Details
convert shop space to living at ground floor including 1 full bath, entertainment rm & office. new internal stairs to connect 1st & 2nd floor. replace some windows and doors. new rear deck at ground floor 2'-0" above grade. no increase to building envelope. | $75,000 |
| Apr 10, 2012 | Completed final sign-off Jun 2012 | 224 Moultrie St | remodel laundry room. create bew bathDetails
remodel laundry room. create bew bath | $8,000 |
| Apr 10, 2012 | Completed final sign-off May 2012 | 506 Foerster St | remodel (e) one bathroom (non structural)Details
remodel (e) one bathroom (non structural) | $11,500 |
| Oct 14, 2011 | Completed final sign-off Feb 2012 | 101 Scott St | build (n) bathroom: install (n) door in (e) study. old door is being replaced at rear.Details
build (n) bathroom: install (n) door in (e) study. old door is being replaced at rear. | $25,000 |
| Aug 22, 2011 | Completed final sign-off Dec 2011 | 1038 Church St | remodel existing kitchen and 1/2 bath. relocate laundry within kitchen. work is within the top level unit. no removal or installation of partitions and openings. install carbon monoxide alarm & smoke detectors. a min of 50% of the total rated wattage of permantely/installed lighting in kithchen.Details
remodel existing kitchen and 1/2 bath. relocate laundry within kitchen. work is within the top level unit. no removal or installation of partitions and openings. install carbon monoxide alarm & smoke detectors. a min of 50% of the total rated wattage of permantely/installed lighting in kithchen. | $31,500 |
| Aug 9, 2011 | Completed final sign-off Aug 2012 | 520 Clipper St | revision to pa# 200410227491-s1: change classification to read correctly, existing family room to be call 'bedroom #4'. existing baths total four, and changes in height of building. build vestibule in garage to create occupancy separation.Details
revision to pa# 200410227491-s1: change classification to read correctly, existing family room to be call 'bedroom #4'. existing baths total four, and changes in height of building. build vestibule in garage to create occupancy separation. | |
| May 9, 2011 | Completed final sign-off Aug 2011 | 178 Henry St | remodel existing kitchen and bath. all (n) lighting must comply with cec150(k)Details
remodel existing kitchen and bath. all (n) lighting must comply with cec150(k) | $17,500 |
| Mar 12, 2007 | Completed final sign-off May 2008 | 182 Banks St | full house remodel including kitchen and bath, seismic upgrade, new windows, new slab and heating system at apartment.Details
full house remodel including kitchen and bath, seismic upgrade, new windows, new slab and heating system at apartment. | $150,000 |
| Jul 18, 2006 | Completed final sign-off Sep 2007 | 258 Arlington St | demo bath and laundry rooms, add 2 story addition for kitchen, stair and master suite, interior remodeling for new bath and laundry.Details
demo bath and laundry rooms, add 2 story addition for kitchen, stair and master suite, interior remodeling for new bath and laundry. | $80,000 |
| Mar 9, 2005 | Never finaled issued Mar 2005, no final | 224 Diamond St | remodel existing kitchen and bath and relocate water heater and washer dryer no structural alteratioDetails
remodel existing kitchen and bath and relocate water heater and washer dryer no structural alteratio | $17,500 |
| Dec 2, 2004 | Completed final sign-off Mar 2005 | 566 08th Av | new bathroom & laundry facility on top floor. discontinutes 2nd kitchen facility.Details
new bathroom & laundry facility on top floor. discontinutes 2nd kitchen facility. | $15,000 |
| Oct 25, 2004 | Completed final sign-off Mar 2005 | 566 08th Av | remodel (e) kitchen, bathroom (2) on 2nd/fl & 3rd/fl. (no structural changes)Details
remodel (e) kitchen, bathroom (2) on 2nd/fl & 3rd/fl. (no structural changes) | $37,000 |
| Oct 12, 2004 | Completed final sign-off Feb 2005 | 81 Benton Av | remodel (e) bathroom. remove water damage to bathroom area and rear of house.Details
remodel (e) bathroom. remove water damage to bathroom area and rear of house. | $18,000 |
| Apr 30, 2002 | Completed final sign-off Jul 2003 | 8 Juri St | new foundations in exist 2 story build, repair walls as needed,rmdl int:kitchn,2 bath,2 bdrm,fmly,stDetails
new foundations in exist 2 story build, repair walls as needed,rmdl int:kitchn,2 bath,2 bdrm,fmly,st | $58,000 |
| Aug 25, 2000 | Completed final sign-off Dec 2000 | 887 Noe St | removate bathroom damage by water damage, replace old stairs & damage porchDetails
removate bathroom damage by water damage, replace old stairs & damage porch | $1,745 |
| Mar 28, 2000 | Expired or cancelled expired Sep 2000 | 175 Prague St | remodel bathroom, new sink,toilet, tub, tile, paint & fixturesDetails
remodel bathroom, new sink,toilet, tub, tile, paint & fixtures |