Back to bathroom remodel contractors
Lotus Construction Dba Ironvine Construc
- Based in
- San Francisco
- On San Francisco permits
- Aug 2011 to Sep 2013
- Last 24 months
- 0 permits filed
12 permits since 2000: 9 completed, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 14 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2013 | Never finaled issued May 2013, no final | 3200 Fillmore St | all (e) windows within scope of work to be replaced, new ada compliant entry, bathroom remodeling, (e) bar to be relocated, no proposed modificatoins to (e) kitchen.Details
all (e) windows within scope of work to be replaced, new ada compliant entry, bathroom remodeling, (e) bar to be relocated, no proposed modificatoins to (e) kitchen. | $120,000 |
| Jan 24, 2013 | Completed final sign-off Nov 2015 | 616 Baker St | ground floor (n) habitable space: (n) one master bedroom, (n) one bathroom, (n) storage & (n) laundry room. 2nd fl renovate (e) bathroom, closets & rear deck. remove (e) lightwell from (e) 2nd & 3rd fls. 3rd fl renovate (e) kitchen, bathroom & closets. remove (e) lightwell from (e) w/in (e) space.Details
ground floor (n) habitable space: (n) one master bedroom, (n) one bathroom, (n) storage & (n) laundry room. 2nd fl renovate (e) bathroom, closets & rear deck. remove (e) lightwell from (e) 2nd & 3rd fls. 3rd fl renovate (e) kitchen, bathroom & closets. remove (e) lightwell from (e) w/in (e) space. | $150,000 |
| Dec 3, 2012 | Completed final sign-off Aug 2013 | 673 Geary St | alterations to (e) bar & restaurant. remodel (e) 4 bathrooms. raise (e) mechanical soffit to accomodate (n) facade design. raise ceiling of (e) exit corridor & install 3/4 hr. rated glass block openings.Details
alterations to (e) bar & restaurant. remodel (e) 4 bathrooms. raise (e) mechanical soffit to accomodate (n) facade design. raise ceiling of (e) exit corridor & install 3/4 hr. rated glass block openings. | $100,000 |
| Oct 6, 2011 | Completed final sign-off Nov 2012 | 1836 Pine St | create occupancy on unoccupied 1st floor, add new family room, bedroom, and full bath. new foundation at (e) 1st floor. interior alterations throughout.Details
create occupancy on unoccupied 1st floor, add new family room, bedroom, and full bath. new foundation at (e) 1st floor. interior alterations throughout. | $250,000 |