Back to bathroom remodel contractors
Lopez Cruz Corp/Dba Frisco Plumbing
- Based in
- San Francisco
- On San Francisco permits
- Mar 2011 to May 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 6 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2026 | In progress issued May 2026 | 2127 Broadway | unit #1: replace kitchen cabinets, install new subpanel, replace lights in the bathroom & kitchen, modify gas line, modify master bathroom - in kind remodel. all work in-kind.Details
unit #1: replace kitchen cabinets, install new subpanel, replace lights in the bathroom & kitchen, modify gas line, modify master bathroom - in kind remodel. all work in-kind. | $60,000 |
| Jun 26, 2024 | Completed final sign-off Dec 2024 | 471 Yerba Buena Av | enlarge (e) main bathroom to connect to primary bedroom and rework closets, revamp (2) existing closets and create new hall bath, turn (e) powder room into closetDetails
enlarge (e) main bathroom to connect to primary bedroom and rework closets, revamp (2) existing closets and create new hall bath, turn (e) powder room into closet | $48,600 |
| Nov 30, 2020 | Expired or cancelled expired May 2026 | 2736 Fulton St | remodel 1st floor only. remodel existing 1st floor bathroom, new window, and exterior doors. replace window in-kind at 3rd floor. no other work at this level.Details
remodel 1st floor only. remodel existing 1st floor bathroom, new window, and exterior doors. replace window in-kind at 3rd floor. no other work at this level. | $11,250 |
| Jul 30, 2018 | Completed final sign-off Oct 2018 | 22 Terra Vista Av | apt b2: replace cabinet, replace bathroom fixtures. replace electrical panel.Details
apt b2: replace cabinet, replace bathroom fixtures. replace electrical panel. | $36,000 |
| May 29, 2018 | Completed final sign-off Jul 2018 | 22 Terra Vista Av | replace kitchen cabinet, bathroom fixts & exhaust fan, electric panel in same location & same size, in-kind. no moving of doors & walls.Details
replace kitchen cabinet, bathroom fixts & exhaust fan, electric panel in same location & same size, in-kind. no moving of doors & walls. | $36,000 |
| Mar 4, 2011 | Completed final sign-off Mar 2013 | 46 Atalaya Tr | bathroom remodel for upper unit.Details
bathroom remodel for upper unit. | $5,000 |