Back to bathroom remodel contractors
Lombardi Property Development
- Based in
- Mill Valley
- On San Francisco permits
- Nov 2021 to Aug 2025
- Last 24 months
- 6 permits filed
18 permits since 2000: 14 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 in progress. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2025 | Completed final sign-off Jun 2025 | 855 Valencia St | in-kind remodeling of 2 kitchen(s) in 2nd fl, 3rd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s).Details
in-kind remodeling of 2 kitchen(s) in 2nd fl, 3rd fl and in-kind remodeling of 2 bathroom(s) in 2nd fl, 3rd fl with 0 shower pan(s). | $42,244 |
| May 22, 2024 | In progress issued May 2024 | 1089 Valencia St | unit g: fixing a bathroom shower pan and valve , new cabinets, repairing an existing plumbing line. bringing the electrical up to code at kitchen, bathroom and livingroom.Details
unit g: fixing a bathroom shower pan and valve , new cabinets, repairing an existing plumbing line. bringing the electrical up to code at kitchen, bathroom and livingroom. | $22,000 |
| Mar 19, 2024 | Completed final sign-off Sep 2024 | 1089 Valencia St | installation of a new accessible bathroom 1 to 1 replacement of (e) incandescent light fixtues with led fixtures, 4 new wall outlets altering wall bewtween the retail unit and the residentail unit to make apt 12 acoustical requirements, interior t.i under separate permit.Details
installation of a new accessible bathroom 1 to 1 replacement of (e) incandescent light fixtues with led fixtures, 4 new wall outlets altering wall bewtween the retail unit and the residentail unit to make apt 12 acoustical requirements, interior t.i under separate permit. | $30,000 |
| Sep 19, 2023 | Completed final sign-off Aug 2024 | 1735 39th Av | interior alter on 1st fl: (n) conditioned entertaiment rm, wet bar, bath, new rear sliding dr. reconfig entry wall. upgrade eletrical panel. 247 sf of conditioned spaceDetails
interior alter on 1st fl: (n) conditioned entertaiment rm, wet bar, bath, new rear sliding dr. reconfig entry wall. upgrade eletrical panel. 247 sf of conditioned space | $45,000 |
| Jul 18, 2023 | Completed final sign-off Oct 2023 | 540 Wildwood Wy | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $18,565 |
| May 3, 2023 | Completed final sign-off Nov 2023 | 1986 45th Av | legalize unpermitted bedroom to family room, remove walk-in closet, legalize unpermitted bathroom, replace (e) window to sliding door/same widthDetails
legalize unpermitted bedroom to family room, remove walk-in closet, legalize unpermitted bathroom, replace (e) window to sliding door/same width | $30,000 |
| Jun 2, 2022 | Completed final sign-off Nov 2022 | 1986 45th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). alteration of service equipment. need a "green tag" for electrical service equipment. | $27,000 |
| Nov 24, 2021 | Completed final sign-off Mar 2022 | 1341 Vallejo St | refinishing 2 bathrooms, new tile and tub. one new shower head on upper floor. all fixtures will use same in wall rough. new kitchen countertop with new electrical outlets.Details
refinishing 2 bathrooms, new tile and tub. one new shower head on upper floor. all fixtures will use same in wall rough. new kitchen countertop with new electrical outlets. | $10,000 |