Back to bathroom remodel contractors
Lnd
- Based in
- San Jose
- On San Francisco permits
- Oct 2009 to Nov 2009
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 115 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 23, 2009 | Completed final sign-off Mar 2010 | 1766 36th Av | install sliding glass dr @indoor patio,drains for patio lath& stucco. replace frt windows.full bath remodel,elec,plb,sheet rock,tile.sink toilet,bath tub&skylight replacement.roof& drain,alteration & repair split bathroom incl.wall removal& infill doors.add 1/2bath&(n)toilet.work on 2/fl.no stru wk.Details
install sliding glass dr @indoor patio,drains for patio lath& stucco. replace frt windows.full bath remodel,elec,plb,sheet rock,tile.sink toilet,bath tub&skylight replacement.roof& drain,alteration & repair split bathroom incl.wall removal& infill doors.add 1/2bath&(n)toilet.work on 2/fl.no stru wk. | $30,000 |