Back to bathroom remodel contractors
Lmnop-Design Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2015 to May 2021
- Last 24 months
- 0 permits filed
16 permits since 2000: 13 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 438 days from filing to permit and 328 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2017 | Expired or cancelled cancelled Jan 2020 | 274 15th Av | horizontal adddition. addition of rear stairs and interior remodel of dwelling. including (n) beds, (n) baths (n) kitchen.Details
horizontal adddition. addition of rear stairs and interior remodel of dwelling. including (n) beds, (n) baths (n) kitchen. | $500,000 |
| Mar 7, 2017 | Completed final sign-off Nov 2018 | 79 09th St | change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors.Details
change of use from cafe to medical cannabis dispensary. renovation of bathroom to ada (n) construction standards. hvac system installed, move toilet, (n) drywall, replace doors. | $150,000 |