Ll Construction
- Based in
- Castro Valley
- On San Francisco permits
- Apr 2024 to May 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2024 | Completed final sign-off Oct 2024 | 21 Coleridge St | interior remodel: converting 240 sq ft garage to habitable new 1st floor bathroom. new mechanical, new water heaterh, replace electrical, replace garage door. repair and replace siding as necessary.replacement of rear windows w/ vinyl windows. in kind replacement of front windows with alum cladDetails
interior remodel: converting 240 sq ft garage to habitable new 1st floor bathroom. new mechanical, new water heaterh, replace electrical, replace garage door. repair and replace siding as necessary.replacement of rear windows w/ vinyl windows. in kind replacement of front windows with alum clad | $70,000 |
| Apr 22, 2024 | Completed final sign-off Oct 2024 | 21 Coleridge St | replacement of toilet, bathtub, sink, exhaust fan (with heatcombo), gfci outlet. replace light fixture. remodel in-kindDetails
replacement of toilet, bathtub, sink, exhaust fan (with heatcombo), gfci outlet. replace light fixture. remodel in-kind | $6,000 |