Back to bathroom remodel contractors
Live Oak Building & Design Inc
- Based in
- Berkeley
- On San Francisco permits
- Aug 2013 to Feb 2020
- Last 24 months
- 0 permits filed
15 permits since 2000: 6 completed, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 never finaled. Typically 1 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2016 | Never finaled issued Aug 2016, no final | 237 Greenwich St | unit #3: rot repair at shower area for floor sheathing & wall surround, partial bathroom remodeling, use high efficacy lighting or controlled by manuel on sensor with high efficacy main light. maintain fire sep between units and 1 hour construction for new workDetails
unit #3: rot repair at shower area for floor sheathing & wall surround, partial bathroom remodeling, use high efficacy lighting or controlled by manuel on sensor with high efficacy main light. maintain fire sep between units and 1 hour construction for new work | $10,000 |
| Aug 10, 2015 | Never finaled issued Aug 2015, no final | 2694 Folsom St | (1) bathroom remodel. change plumbing & light fixtures. new tile, cabinets, counter tops.Details
(1) bathroom remodel. change plumbing & light fixtures. new tile, cabinets, counter tops. | $16,600 |
| Nov 17, 2014 | Completed final sign-off Dec 2015 | 3997 Washington St | renovate (e) kitchen & baths, remove non-bearing partition separating kitchen & dining rooms, replace 5 aluminum window with wood to match extg u less than or equal 0.32Details
renovate (e) kitchen & baths, remove non-bearing partition separating kitchen & dining rooms, replace 5 aluminum window with wood to match extg u less than or equal 0.32 | $123,000 |
| Nov 5, 2014 | Completed final sign-off Apr 2015 | 135 Fillmore St | kitchen remodel, with removal of a portion of a load bearing wall, partial demolition of half bathroom, remodel of laundry area. new lighting & electrical in kitchen and laundry area,new plumbing work in kitchen including relocation of (e) pipes.Details
kitchen remodel, with removal of a portion of a load bearing wall, partial demolition of half bathroom, remodel of laundry area. new lighting & electrical in kitchen and laundry area,new plumbing work in kitchen including relocation of (e) pipes. | $30,000 |