Back to bathroom remodel contractors
Liu Michael Construction Co.(Check Id)
- Based in
- San Francisco
- On San Francisco permits
- Aug 2005 to May 2024
- Last 24 months
- 0 permits filed
24 permits since 2000: 24 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 0 days from filing to permit and 33 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 9, 2024 | Completed final sign-off Jul 2024 | 25 Galilee Ln | unit #3 1 bathroom remodel. (back) bathroom bathtub. remove damaged old tub, tile, and sheetrock. install new 60"x30" bathtub, waterproof paper. cement board, tiles.Details
unit #3 1 bathroom remodel. (back) bathroom bathtub. remove damaged old tub, tile, and sheetrock. install new 60"x30" bathtub, waterproof paper. cement board, tiles. | $5,000 |
| Jul 31, 2023 | Completed final sign-off Sep 2023 | 25 Galilee Ln | unit #3. front bathroom bathtub. remove damaged old tub, tile, and sheetrock. install new 60"x30" bathtub and bathtub wall set. before install waterproof paper. cement board. single bathroom remodel.Details
unit #3. front bathroom bathtub. remove damaged old tub, tile, and sheetrock. install new 60"x30" bathtub and bathtub wall set. before install waterproof paper. cement board. single bathroom remodel. | $5,000 |
| Jun 24, 2022 | Completed final sign-off Jul 2022 | 1545 Geary | unit #6: front bathroom (3 sides)two sides around the bath tub wall: 30"x60",one side 60"x60" remove old sheet rock install water proof paper, cement board, plastic sheetDetails
unit #6: front bathroom (3 sides)two sides around the bath tub wall: 30"x60",one side 60"x60" remove old sheet rock install water proof paper, cement board, plastic sheet | $6,800 |
| Nov 14, 2018 | Completed final sign-off Mar 2019 | 1400 Webster St | kitchen remodel, cabinets, flooring, counters, tiles bath remodel x2, bathtub, sink, vanity, tile, toilet, cement board, no structural work. no wall modificationDetails
kitchen remodel, cabinets, flooring, counters, tiles bath remodel x2, bathtub, sink, vanity, tile, toilet, cement board, no structural work. no wall modification | $30,000 |
| Jul 14, 2008 | Completed final sign-off Aug 2008 | 1435 Laguna St | work @ unit# 5 only. repair job: in back. 1 bathroom. remove (e) tile shower wall surface around bathtub (32" x 80", 60" x 80", 32" x 80") install new hardy board & new ceramic tiles. no plumbing & no electrical work. no change to vanity. no change to window, doors or exits.Details
work @ unit# 5 only. repair job: in back. 1 bathroom. remove (e) tile shower wall surface around bathtub (32" x 80", 60" x 80", 32" x 80") install new hardy board & new ceramic tiles. no plumbing & no electrical work. no change to vanity. no change to window, doors or exits. | $3,050 |
| Jul 1, 2008 | Completed final sign-off Jul 2008 | 1540 O'farrell St | work @ unit# 5 only. repair job: in back bathroom: remove (e) old tiles & old sheetrock, near the bath tub three side's wall about 32" x 80". 60" x 80" & 32" 80" , install new 5/8" green boad sheetrock & new ceramic tiles. no plumbing & no electrical work.Details
work @ unit# 5 only. repair job: in back bathroom: remove (e) old tiles & old sheetrock, near the bath tub three side's wall about 32" x 80". 60" x 80" & 32" 80" , install new 5/8" green boad sheetrock & new ceramic tiles. no plumbing & no electrical work. | $2,800 |
| Jan 9, 2008 | Completed final sign-off Jan 2008 | 5 Galilee Ln | unit#6. repair job in back bathrm (e) old tiles and old sheetrock near the bath tub. three side walls 32"x80", 60"x80", 32"x80". install new 5/8" greenboard sheetrock and new 4"x4" ceramic tiles. no structural work. no electric & no plumbing job. no ligting.Details
unit#6. repair job in back bathrm (e) old tiles and old sheetrock near the bath tub. three side walls 32"x80", 60"x80", 32"x80". install new 5/8" greenboard sheetrock and new 4"x4" ceramic tiles. no structural work. no electric & no plumbing job. no ligting. | $2,700 |
| Nov 27, 2007 | Completed final sign-off Dec 2007 | 35 Western Shore Ln | repair job: in bathroom, remove (e) old tiles & old sheetrock near the bathtub three side's wall about 32"x80", 60"x80" & 32"x80", install new 5/8" green boad sheetrock & new ceramic tiles, no plumbing & no electric work.Details
repair job: in bathroom, remove (e) old tiles & old sheetrock near the bathtub three side's wall about 32"x80", 60"x80" & 32"x80", install new 5/8" green boad sheetrock & new ceramic tiles, no plumbing & no electric work. | $2,900 |
| Aug 2, 2007 | Completed final sign-off Sep 2007 | 65 Western Shore Ln | repair job: in back bathroom: remove (e) old tiles & old sheetrock near the bath tub three side wall about 32"x80". 60"x 80" . 32"x80". install new 5/8" green boad sheetrock & new 4"x4" ceramic tiles. no plumbing. no electric work.Details
repair job: in back bathroom: remove (e) old tiles & old sheetrock near the bath tub three side wall about 32"x80". 60"x 80" . 32"x80". install new 5/8" green boad sheetrock & new 4"x4" ceramic tiles. no plumbing. no electric work. | $2,500 |
| Jun 4, 2007 | Completed final sign-off Jul 2007 | 1460 Webster St | work @ unit# 4 only. remodel bathroom: take off old toilet, sink, bathtub & old tile wall. install new toilet, sink, new shower pan (32" x 60") 5/8" green board sheetrock & ceramic tile on wall & floor, new shower faucet & head. change new gfci outlet. change motion switch & light.Details
work @ unit# 4 only. remodel bathroom: take off old toilet, sink, bathtub & old tile wall. install new toilet, sink, new shower pan (32" x 60") 5/8" green board sheetrock & ceramic tile on wall & floor, new shower faucet & head. change new gfci outlet. change motion switch & light. | $8,500 |
| Apr 25, 2007 | Completed final sign-off Jul 2007 | 25 Galilee Ln | work @ unit# 6 only. remodel bathroom. take off old toilet. sink & bathtub & old tile's wall. install new toilet sink & new shower pan (32" x 60") hardy boad on wall. ceramic tile on wall & floor. new shower faucet & head. change new gfci outlet. will get plumbing permit & electric permit (gfci).Details
work @ unit# 6 only. remodel bathroom. take off old toilet. sink & bathtub & old tile's wall. install new toilet sink & new shower pan (32" x 60") hardy boad on wall. ceramic tile on wall & floor. new shower faucet & head. change new gfci outlet. will get plumbing permit & electric permit (gfci). | $8,000 |
| Mar 8, 2007 | Completed final sign-off Apr 2007 | 20 Quickstep Ln | work @ unit# 2 only. repair job: in bathroom: remove (e) old tile & old sheetrocknear the bathtub. 3 side wall about 30" x 80". 60" x 80". 30" x 80". install new 5/8" greenboard sheetrock & new 8" x 10" ceramic tiles. no plumbing. no electric work.Details
work @ unit# 2 only. repair job: in bathroom: remove (e) old tile & old sheetrocknear the bathtub. 3 side wall about 30" x 80". 60" x 80". 30" x 80". install new 5/8" greenboard sheetrock & new 8" x 10" ceramic tiles. no plumbing. no electric work. | $2,500 |
| May 2, 2006 | Completed final sign-off May 2006 | 1315 Laguna St | repair job: in bathroom: remove (e) old tiles & old sheetrock near the bathtub three side wall about 30"x80". 60"x80". 30"x80" . install new 5/8" greenboad sheetrock & new ceramic tiles. (see picture.)Details
repair job: in bathroom: remove (e) old tiles & old sheetrock near the bathtub three side wall about 30"x80". 60"x80". 30"x80" . install new 5/8" greenboad sheetrock & new ceramic tiles. (see picture.) | $1,800 |