Back to bathroom remodel contractors
Little Feet Renovation
- Based in
- Pacifica
- On San Francisco permits
- Nov 2009 to Mar 2026
- Last 24 months
- 7 permits filed
56 permits since 2000: 38 completed, 7 in progress, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 never finaled. Typically 2 days from filing to permit and 239 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 14, 2024 | Completed final sign-off Oct 2025 | 39 Sanchez St | remodel existing bathroom and powder room in 39 sanchez. remodel existing kitchen in 39 sanchez. like for like. remodel bathroom & add laundry room in closet in 41 sanchezDetails
remodel existing bathroom and powder room in 39 sanchez. remodel existing kitchen in 39 sanchez. like for like. remodel bathroom & add laundry room in closet in 41 sanchez | $75,000 |
| Sep 4, 2024 | Completed final sign-off Oct 2024 | 459 Broadway | rev 202402166061- proposed ada restroom upgrade to be compliant includes relocating bathroom door. removing sink and counter. relocating proposed ada bathroom door.Details
rev 202402166061- proposed ada restroom upgrade to be compliant includes relocating bathroom door. removing sink and counter. relocating proposed ada bathroom door. | |
| Feb 16, 2024 | Completed final sign-off Oct 2024 | 447 Broadway | new ada bathroom and kitchen sink for work in commercial space.Details
new ada bathroom and kitchen sink for work in commercial space. | $10,000 |
| Jul 2, 2021 | Completed final sign-off Feb 2022 | 4835 Geary Bl | remodel kitchen with new stove location. replace 1 window kn kind, replace 1 door to exterior stairwell in kind. remodel bath & toilet room in kind. no rough opening changes. no new wall & no existing wall relocation. u factor for new windows not to exceed. all work kn residential unit. lighting inDetails
remodel kitchen with new stove location. replace 1 window kn kind, replace 1 door to exterior stairwell in kind. remodel bath & toilet room in kind. no rough opening changes. no new wall & no existing wall relocation. u factor for new windows not to exceed. all work kn residential unit. lighting in | $48,000 |
| Nov 3, 2020 | Completed final sign-off Oct 2021 | 4004 Mission St | repair (e) bathroom, sheetrock & isulation in restaurant after water damage, upgrade any exposed electrical while sheetrock is open. 500 sq feet of sheetrock.Details
repair (e) bathroom, sheetrock & isulation in restaurant after water damage, upgrade any exposed electrical while sheetrock is open. 500 sq feet of sheetrock. | $15,000 |
| Aug 6, 2020 | Completed final sign-off Mar 2021 | 3117 16th St | remodel existing bathroom as an ada compliant bathroom.Details
remodel existing bathroom as an ada compliant bathroom. | $33,189 |
| Apr 26, 2018 | Completed final sign-off May 2021 | 425 Brazil Av | remodel (e) laundry & crawlspace to (n) bedroom, office & bathroomDetails
remodel (e) laundry & crawlspace to (n) bedroom, office & bathroom | $120,000 |
| Nov 18, 2013 | Completed final sign-off Mar 2014 | 378 Madrid St | revision to pa# 201309035800, install 12' (n) foundation, install 1 non load bearing wall for hallway to bathroom.Details
revision to pa# 201309035800, install 12' (n) foundation, install 1 non load bearing wall for hallway to bathroom. | $3,000 |
| May 31, 2013 | Never finaled issued May 2013, no final | 2454 Great Hy | re-tile tub surround & floor, remove (e) shower stall, extend (e) closet, install bath fan & new lighting, replace shower valve, toilet & sink, new window in bath, all work in kind.Details
re-tile tub surround & floor, remove (e) shower stall, extend (e) closet, install bath fan & new lighting, replace shower valve, toilet & sink, new window in bath, all work in kind. | $5,000 |
| Feb 24, 2012 | Completed final sign-off Jan 2013 | 2541 24th St | new electrical upgrade including service panel, new water heater (tankless), interior bathroom remodel, replace two windows in laundry room in-kind. replace exterior door. not visible from street.Details
new electrical upgrade including service panel, new water heater (tankless), interior bathroom remodel, replace two windows in laundry room in-kind. replace exterior door. not visible from street. | $25,000 |
| Feb 24, 2010 | Completed final sign-off Nov 2010 | 254 Arlington St | upgrade wiring in unit 256. upgrade svc panel in bldg. upgrade windows in 256. remodel kitchen cabs, countertops, replace bath tile, toilets,sink ,shower fixtures with low flow.convert 2nd sty front facade wdw to 2-window wood clad sash double hung, replace front bay wdw,new skylight in kitchen 256Details
upgrade wiring in unit 256. upgrade svc panel in bldg. upgrade windows in 256. remodel kitchen cabs, countertops, replace bath tile, toilets,sink ,shower fixtures with low flow.convert 2nd sty front facade wdw to 2-window wood clad sash double hung, replace front bay wdw,new skylight in kitchen 256 | $110,000 |
| Nov 6, 2009 | Completed final sign-off Feb 2010 | 254 Arlington St | repair missing exterior siding, replace dry rot (e) framing as needed in rear bedroom of 1st floor, dry wall to be replaced etc...replace roof drain at lightwell above 1st floor bathroom with larger dia, roof drain & reflash & replace (e) lightwell roof (roughly 10sq), not visible from streetDetails
repair missing exterior siding, replace dry rot (e) framing as needed in rear bedroom of 1st floor, dry wall to be replaced etc...replace roof drain at lightwell above 1st floor bathroom with larger dia, roof drain & reflash & replace (e) lightwell roof (roughly 10sq), not visible from street | $11,000 |