Lion General Construction
- Based in
- Redwood City
- On San Francisco permits
- Oct 2019 to May 2023
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 4, 2023 | Completed final sign-off Sep 2023 | 563 Munich St | bathroom remodel like for like 5-5x7-3=39.27sfbaDetails
bathroom remodel like for like 5-5x7-3=39.27sfba | $15,000 |
| Jul 1, 2021 | Never finaled issued Jul 2021, no final | 646 05th Av | replace on kind deck and stairs repair only. less than 50% of area to be replaced.Details
replace on kind deck and stairs repair only. less than 50% of area to be replaced. | $10,000 |
| Aug 13, 2020 | Completed final sign-off Oct 2020 | 642 05th Av | replacement of old rotten wood material onexisting stair case. replacement of wood siding withnew material. no structural work. no change to existing framing, same foot print, same layout. stair work less than 50% no change to material.Details
replacement of old rotten wood material onexisting stair case. replacement of wood siding withnew material. no structural work. no change to existing framing, same foot print, same layout. stair work less than 50% no change to material. | $9,000 |
| Oct 18, 2019 | Never finaled issued Oct 2019, no final | 1910 Green St | remodel add a pocket door to the 1st fl of e sfd. no changes 2nd, 3rd, 4th fl. no change to exterior. maintain e egressDetails
remodel add a pocket door to the 1st fl of e sfd. no changes 2nd, 3rd, 4th fl. no change to exterior. maintain e egress | $2,000 |