Permit GraphShortlistSan Francisco building permits since 2000

Lingruen Associates

Contractor license
869677
State license record
Based in
San Francisco
On San Francisco permits
May 2010 to Jul 2021
Last 24 months
0 permits filed

13 permits since 2000: 12 completed, 1 never finaled.

Of the 1 never-finaled permit, 1 is 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Deck permits

AllDeck 3Stairs 1Bathroom remodel 1

3 deck permits: 3 completed. Typically 0 days from filing to permit and 144 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 23, 2017Completed
final sign-off Jan 2018
1367 28th Avperform repairs as per lingruen assoc. termit report #76589-o, items 1a, 2a, 3a, 3c, 3d, 4b, 5a, 5c. deck and stair less than 50%
Details
Permit
201708235639
Status
complete
Filed
Aug 23, 2017
Permit issued
Aug 23, 2017
Final sign-off
Jan 24, 2018
Declared cost
$23,000
Address
1367 28th Av

perform repairs as per lingruen assoc. termit report #76589-o, items 1a, 2a, 3a, 3c, 3d, 4b, 5a, 5c. deck and stair less than 50%

Open the permit page

$23,000
Jul 15, 2010Completed
final sign-off Jun 2011
1233 Athens Stdemolish (e) rear yard wood deck & replace with (n) deck. add (n) 1-hour wall adjacent to (n) deck along west property line. install (n) half-bath & closet in (e) dwelling.
Details
Permit
201007156745
Status
complete
Filed
Jul 15, 2010
Permit issued
Apr 20, 2011
Final sign-off
Jun 2, 2011
Declared cost
$44,000
Address
1233 Athens St

demolish (e) rear yard wood deck & replace with (n) deck. add (n) 1-hour wall adjacent to (n) deck along west property line. install (n) half-bath & closet in (e) dwelling.

Open the permit page

$44,000
May 24, 2010Completed
final sign-off Oct 2010
2333 Octavia Stperform repairs at right side deck by removing stucco as necessary, repairing damaged wood members with new material, & refinishing disturbed areas to a reasonable match less than 50% repair
Details
Permit
201005243059
Status
complete
Filed
May 24, 2010
Permit issued
May 24, 2010
Final sign-off
Oct 15, 2010
Declared cost
$15,000
Address
2333 Octavia St

perform repairs at right side deck by removing stucco as necessary, repairing damaged wood members with new material, & refinishing disturbed areas to a reasonable match less than 50% repair

Open the permit page

$15,000