Back to bathroom remodel contractors
Line Construction Llc
- Based in
- Palo Alto
- On San Francisco permits
- Dec 2020 to Mar 2026
- Last 24 months
- 3 permits filed
13 permits since 2000: 11 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 6 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | Completed final sign-off Mar 2026 | 1390 Rhode Island St | revision to pa #202410032218: adjust window size at 1st entry floor & 2nd flr to reflect built condition, revise powder room layout for unit 1. revise primary bath/bedroom layout for unit 2. add interior railling dtlDetails
revision to pa #202410032218: adjust window size at 1st entry floor & 2nd flr to reflect built condition, revise powder room layout for unit 1. revise primary bath/bedroom layout for unit 2. add interior railling dtl | $2,000 |
| Jul 30, 2024 | Expired or cancelled expired Mar 2026 | 1390 Rhode Island St | drywall replacement throughout building excluding kitchens and bathrooms. approx 2000sf no structural work. no layout changes. no wall modifications. replace with 5/8" typexDetails
drywall replacement throughout building excluding kitchens and bathrooms. approx 2000sf no structural work. no layout changes. no wall modifications. replace with 5/8" typex | $3,000 |
| Nov 30, 2023 | Completed final sign-off Jan 2025 | 4727 25th St | interior renovation of 1st fl bath. 2nd fl kitchen, dining, living rm. modify hvac. remove bearinig wall on 2nd flr. no envelope expansion or exterior changes at frontDetails
interior renovation of 1st fl bath. 2nd fl kitchen, dining, living rm. modify hvac. remove bearinig wall on 2nd flr. no envelope expansion or exterior changes at front | $170,000 |