Back to bathroom remodel contractors
Lin's Builder
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Feb 2025
- Last 24 months
- 3 permits filed
54 permits since 2000: 42 completed, 2 in progress, 2 never finaled, 8 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 10 completed, 4 expired or cancelled. Typically 32 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2021 | Expired or cancelled expired Apr 2025 | 152 London St | revision to pa# 202010176779. 2nd floor: reconfigure layout per plan add 1 full bath. add stair to connect w/ attic.Details
revision to pa# 202010176779. 2nd floor: reconfigure layout per plan add 1 full bath. add stair to connect w/ attic. | $4,000 |
| Feb 19, 2021 | Completed final sign-off Aug 2021 | 1751 Lake St | replace kitchen & bathroom cabinets, countertops & tileDetails
replace kitchen & bathroom cabinets, countertops & tile | $30,000 |
| Nov 19, 2020 | Completed final sign-off Jan 2022 | 29 Rausch St | work to be performed at 3rd (#29) fl only. reconfigure and relocate kitchen, remodel (2) full baths, convert living room and family room into bedrooms. replace and relocate tank type water heater with tankless type. install lighting, switches, and receptacles.Details
work to be performed at 3rd (#29) fl only. reconfigure and relocate kitchen, remodel (2) full baths, convert living room and family room into bedrooms. replace and relocate tank type water heater with tankless type. install lighting, switches, and receptacles. | $50,000 |
| Oct 17, 2020 | Expired or cancelled expired Apr 2025 | 152 London St | 2/f: remodel (e) kitchen & bathroom. add 1 bedroom & 1.5 baths & nook.Details
2/f: remodel (e) kitchen & bathroom. add 1 bedroom & 1.5 baths & nook. | $30,000 |
| Dec 6, 2019 | Completed final sign-off Jul 2025 | 477 Oak St | 3rd fl, unit 477 - reconfig fl plan to create combined living,dining & kitchen, 5 bedrms, 2 baths; 2nd fl, unit 479 - reconfig fl plan to create living, dining & kitchen, 3 bedrms, play rm, 1 full bath & half bath; ground fl part of unit 479 - add 2 bedrms, office & 2 full baths.Details
3rd fl, unit 477 - reconfig fl plan to create combined living,dining & kitchen, 5 bedrms, 2 baths; 2nd fl, unit 479 - reconfig fl plan to create living, dining & kitchen, 3 bedrms, play rm, 1 full bath & half bath; ground fl part of unit 479 - add 2 bedrms, office & 2 full baths. | $250,000 |
| Dec 5, 2017 | Completed final sign-off Dec 2018 | 578 Gellert Dr | convert part of garage into new bedroom and bath suite. remodel (e) 1st flr bath. add 1 full bath at upper level. infill (e) lightwellDetails
convert part of garage into new bedroom and bath suite. remodel (e) 1st flr bath. add 1 full bath at upper level. infill (e) lightwell | $60,000 |
| Jan 8, 2016 | Completed final sign-off May 2016 | 443 27th Av | remodel existing bath and toilet on 2/f, new fixtures, new tile.Details
remodel existing bath and toilet on 2/f, new fixtures, new tile. | $10,000 |
| Sep 3, 2015 | Completed final sign-off Sep 2017 | 1446 11th Av | ground floor: add one half bath, one bedroom, one theater.Details
ground floor: add one half bath, one bedroom, one theater. | $48,000 |
| Aug 12, 2015 | Completed final sign-off Feb 2016 | 2371 Greenwich St | remodel kitchen, bathroom & relocate rear stair at 2nd floor per planDetails
remodel kitchen, bathroom & relocate rear stair at 2nd floor per plan | $23,600 |
| Dec 30, 2014 | Completed final sign-off Aug 2015 | 50 Farragut Av | construct two (n) bathrooms, one family room, & three bedrooms on ground floor. replace (e) furnace & water heater.Details
construct two (n) bathrooms, one family room, & three bedrooms on ground floor. replace (e) furnace & water heater. | $60,000 |
| Dec 2, 2009 | Completed final sign-off May 2010 | 3815 Alemany Bl | construct rear deck (max. 8'x2" ht. from existing gade with stairs. add 2 bedrooms, 1 half bathroom, 1 storage & laundry area on existing ground floor per plans.Details
construct rear deck (max. 8'x2" ht. from existing gade with stairs. add 2 bedrooms, 1 half bathroom, 1 storage & laundry area on existing ground floor per plans. | $40,000 |
| Aug 18, 2008 | Completed final sign-off Oct 2009 | 115 Lobos St | (e) addition (431 sq ft) 2nd floor-new bathroom, bedroom and new deck at 1st floorDetails
(e) addition (431 sq ft) 2nd floor-new bathroom, bedroom and new deck at 1st floor | $95,500 |
| Nov 16, 2007 | Expired or cancelled expired Sep 2008 | 3595 Balboa St | ti to convert vacant space into office with one accessible bathDetails
ti to convert vacant space into office with one accessible bath | $20,000 |
| Jan 23, 2002 | Expired or cancelled expired Jul 2002 | 808 33rd Av | remodel kitchen room & bathroom, no change in walls, non structural workDetails
remodel kitchen room & bathroom, no change in walls, non structural work | $15,000 |