Back to bathroom remodel contractors
Lima Construction
- Based in
- Brentwood
- On San Francisco permits
- Jan 2025 to Mar 2025
- Last 24 months
- 3 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 40 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2025 | Completed final sign-off Apr 2025 | 37 Walnut St | remodel master bathroom, shower floor install new shower drain, new shower pan, mambrane & new tile on shower fl & partial wallsDetails
remodel master bathroom, shower floor install new shower drain, new shower pan, mambrane & new tile on shower fl & partial walls | $30,000 |
| Jan 7, 2025 | Completed final sign-off Mar 2025 | 435 Wilde Av | remodel 3 bathrooms. at kitchen replacing cabinets and countertops only. re-use existing appliances and fixtures.Details
remodel 3 bathrooms. at kitchen replacing cabinets and countertops only. re-use existing appliances and fixtures. | $50,000 |