Back to bathroom remodel contractors
Lightning Constructoin
- Based in
- Redwood City
- On San Francisco permits
- Dec 2014 to Sep 2016
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 457 days from filing to permit and 213 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2014 | Completed final sign-off Oct 2016 | 541 Mississippi St | addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door.Details
addition of new master bathroom over (e) deck over 1st floor. addition to master bedroom over (e) 1st floor roof / deck. change garage door wider door. | $60,000 |