Back to bathroom remodel contractors
Liberty Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Jul 2026
- Last 24 months
- 1 permit filed
93 permits since 2000: 64 completed, 1 in progress, 13 never finaled, 15 expired or cancelled.
Of the 13 never-finaled permits, 2 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 21 completed, 1 in progress, 2 expired or cancelled. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Jul 2026 | 501 Campbell Av | add 1 full bathroom, remodel kitchen, and replace 3 windows.Details
add 1 full bathroom, remodel kitchen, and replace 3 windows. | $60,000 |
| Feb 24, 2022 | Completed final sign-off Aug 2022 | 209 South Hill Bl | on ground floor: add one bedroom, one full bathroom and entertainment room as show on proposed plans.Details
on ground floor: add one bedroom, one full bathroom and entertainment room as show on proposed plans. | $50,000 |
| Sep 20, 2019 | Completed final sign-off Dec 2019 | 48 Gillette Av | 2nd fl: remodel (e) kitchen and bathroom, add 1 new full bath, ground fl: add 1 family room & laundry roomDetails
2nd fl: remodel (e) kitchen and bathroom, add 1 new full bath, ground fl: add 1 family room & laundry room | $80,000 |
| Apr 10, 2018 | Completed final sign-off Jul 2018 | 112 Nueva Av | add new bedroom on 2nd fl. add storage room on ground fl. remodel kitchen & two bathrooms.Details
add new bedroom on 2nd fl. add storage room on ground fl. remodel kitchen & two bathrooms. | $20,000 |
| Mar 5, 2018 | Completed final sign-off Apr 2018 | 1942 Vicente St | kitchen and bathroom remodel. replace in kind. no walls to be removedDetails
kitchen and bathroom remodel. replace in kind. no walls to be removed | $16,000 |
| Jan 6, 2017 | Completed final sign-off Jun 2019 | 355 Tocoloma Av | legalize a 2nd dwelling unit at the 1st flr of an (e) single family dwelling per ordinance 43-14. the bedroom, entertainment, kitchen, dining, living, bathroom and (2) storages to be legalized per plan.Details
legalize a 2nd dwelling unit at the 1st flr of an (e) single family dwelling per ordinance 43-14. the bedroom, entertainment, kitchen, dining, living, bathroom and (2) storages to be legalized per plan. | $8,000 |
| Sep 16, 2015 | Completed final sign-off Nov 2015 | 125 Clayton St | unit #8 change kitchen cabinets & retile & change toilet & vanity in bathroom.Details
unit #8 change kitchen cabinets & retile & change toilet & vanity in bathroom. | $12,000 |
| May 19, 2015 | Completed final sign-off May 2017 | 140 San Leandro Wy | remodel 3 bathrooms and add closet to 2nd flr. convert (e) storage space ro a guest bedroom with full bathroom. create playroom with closet, relocate central heatin; upgrade electrical and turn half bath into full by adding shower. all work in interior. maher naDetails
remodel 3 bathrooms and add closet to 2nd flr. convert (e) storage space ro a guest bedroom with full bathroom. create playroom with closet, relocate central heatin; upgrade electrical and turn half bath into full by adding shower. all work in interior. maher na | $120,000 |
| Aug 9, 2012 | Completed final sign-off Nov 2012 | 12 Concord St | proposed to add one family room and one full bath on the ground level as shown on proposed plans.Details
proposed to add one family room and one full bath on the ground level as shown on proposed plans. | $36,000 |
| Feb 22, 2012 | Completed final sign-off Mar 2012 | 233 San Jose Av | proposed to remodel. a full bath and a half bath as clouded on plans.Details
proposed to remodel. a full bath and a half bath as clouded on plans. | $20,000 |
| Mar 28, 2011 | Completed final sign-off Jun 2011 | 440 Blanken Av | add new play room, and new full bathroom at f ground/garage levelDetails
add new play room, and new full bathroom at f ground/garage level | $25,000 |
| Feb 26, 2010 | Completed final sign-off Jul 2010 | 336 Lathrop Av | revision to appl #200910209333: remove skylights in kitchen, close second floor rear bedroom & bathroom windows. install vent in bathroom, reduce size of front window on first floor.Details
revision to appl #200910209333: remove skylights in kitchen, close second floor rear bedroom & bathroom windows. install vent in bathroom, reduce size of front window on first floor. | $300 |
| Oct 20, 2009 | Completed final sign-off Jul 2010 | 336 Lathrop Av | interior remodel @ 1st & 2nd floor. abate following nov h9404570, 200455356,200452375,20045156,200671813,200683761,200452341. two new bedrooms, full bathroom,family rm & laundry room @ 1st floor. 2nd fl. kitchen remodel.move stairs & 3 new skylights.Details
interior remodel @ 1st & 2nd floor. abate following nov h9404570, 200455356,200452375,20045156,200671813,200683761,200452341. two new bedrooms, full bathroom,family rm & laundry room @ 1st floor. 2nd fl. kitchen remodel.move stairs & 3 new skylights. | $85,000 |
| Aug 17, 2009 | Completed final sign-off Oct 2009 | 417 Fulton St | unit #4 fire repair - remove & replace kitchen cabinet, sheetrock, broken window (in the kitchen & bathroom, 250 s.f), replace 4 (2 x6) & 100 s.f. siding.Details
unit #4 fire repair - remove & replace kitchen cabinet, sheetrock, broken window (in the kitchen & bathroom, 250 s.f), replace 4 (2 x6) & 100 s.f. siding. | $8,500 |
| Oct 15, 2008 | Completed final sign-off Dec 2008 | 1453 23rd Av | in compliance with compliant #200871769 dated 9/8/2008, no work to take place at rear of 2/f. remodel kitchen and 1 bathroom on 2/f, change new furnace & ducting & water heater, same location & upgrade circuit panel & lights.Details
in compliance with compliant #200871769 dated 9/8/2008, no work to take place at rear of 2/f. remodel kitchen and 1 bathroom on 2/f, change new furnace & ducting & water heater, same location & upgrade circuit panel & lights. | $30,000 |
| Oct 14, 2008 | Completed final sign-off Jun 2009 | 1453 23rd Av | comply with 200871769: legalize existing full bath on second fl as shown on plans, add a storage room on ground floor. horizontal and vertical addition. to comply w/ nov #200871769, date 9/08/2008. other items separate permit.Details
comply with 200871769: legalize existing full bath on second fl as shown on plans, add a storage room on ground floor. horizontal and vertical addition. to comply w/ nov #200871769, date 9/08/2008. other items separate permit. | $15,000 |
| Aug 10, 2007 | Completed final sign-off Nov 2007 | 1730 Mckinnon Av | proposed to build playing room, storage room & full bath on the grnd levelDetails
proposed to build playing room, storage room & full bath on the grnd level | $12,000 |
| Apr 26, 2007 | Completed final sign-off Sep 2007 | 231 San Jose Av | work in one unit #235 san jose ave only. remolding bath room. (change new bath tub and sink & install tiles) flourest lighting or centrol by motion sensor. no window or door work on this permit.Details
work in one unit #235 san jose ave only. remolding bath room. (change new bath tub and sink & install tiles) flourest lighting or centrol by motion sensor. no window or door work on this permit. | $6,000 |
| Feb 22, 2007 | Completed final sign-off Jun 2007 | 1025 Alabama St | comply with physical inspection report#3r-4768 dated 01/29/07. (attached) provide handrail at front entry stairs, aproper landing from master bath to master br, a compling handrail for stairway to rear yard and install approved eather stripping at all doors leading from heated to unheated areas.Details
comply with physical inspection report#3r-4768 dated 01/29/07. (attached) provide handrail at front entry stairs, aproper landing from master bath to master br, a compling handrail for stairway to rear yard and install approved eather stripping at all doors leading from heated to unheated areas. | $600 |
| Dec 18, 2006 | Completed final sign-off Mar 2007 | 39 Sargent St | add bedroom, family room and bath at ground floor.Details
add bedroom, family room and bath at ground floor. | $30,000 |
| Sep 13, 2006 | Completed final sign-off Dec 2006 | 51 Saint Charles Av | legalize (e) office, laundry, bath & storage room per plan. open a door at garage.Details
legalize (e) office, laundry, bath & storage room per plan. open a door at garage. | $25,000 |
| May 24, 2005 | Completed final sign-off Jan 2006 | 1287 Sanchez St | reremolding bathroom, change new tub toilet & sinkDetails
reremolding bathroom, change new tub toilet & sink | $5,000 |
| Oct 30, 2003 | Expired or cancelled expired Jan 2005 | 1027 Alabama St | legalize 2nd dwelling unit with 1 bedroom, 1 storage room, 1 study, 1 bathroom and construct garageDetails
legalize 2nd dwelling unit with 1 bedroom, 1 storage room, 1 study, 1 bathroom and construct garage | $16,000 |
| Jun 11, 2003 | Expired or cancelled expired Sep 2004 | 2445 Bay St | remove sheetrock & stucco to repair studs. remolding kitchen & bathrooms. no structural work.Details
remove sheetrock & stucco to repair studs. remolding kitchen & bathrooms. no structural work. | $25,000 |