Back to bathroom remodel contractors
Li Ren Construction Company
- Based in
- San Francisco
- On San Francisco permits
- Jul 2001 to Oct 2011
- Last 24 months
- 0 permits filed
22 permits since 2000: 17 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 7, 2011 | Completed final sign-off Dec 2011 | 361 Girard St | add 2 new bedrooms and 1 full bath romm at ground floor/ garage floorDetails
add 2 new bedrooms and 1 full bath romm at ground floor/ garage floor | $52,000 |
| Aug 29, 2008 | Completed final sign-off Nov 2009 | 331 Bennington St | 1)remodeling of a s.f.d. 2)add one bedroom, 2 full baths, one closet, one open deck on 1st floor 3) add one skylight at 2nd floor dining room. 4) new wood deck over extg concrete deck. 5) replace extg stair at 1st floor. 6) relocate washer and dryer at 1st floorDetails
1)remodeling of a s.f.d. 2)add one bedroom, 2 full baths, one closet, one open deck on 1st floor 3) add one skylight at 2nd floor dining room. 4) new wood deck over extg concrete deck. 5) replace extg stair at 1st floor. 6) relocate washer and dryer at 1st floor | $40,000 |
| Apr 4, 2008 | Completed final sign-off Feb 2009 | 121 Maywood Dr | remove existing bay structure on the south side of building. remodel 3 bathrooms, closets and kitchen. replace exsiting windows. install simpson strong wall at front garage and install plywood sheathing at rear building walls. (n) wall on top of ret.wall & (n)access dr to crawl space @ lower lvlDetails
remove existing bay structure on the south side of building. remodel 3 bathrooms, closets and kitchen. replace exsiting windows. install simpson strong wall at front garage and install plywood sheathing at rear building walls. (n) wall on top of ret.wall & (n)access dr to crawl space @ lower lvl | $76,000 |
| Aug 13, 2007 | Completed final sign-off Jan 2008 | 54 Palm Av | repalce tile, tubs,counter top & sink at bathroom. also repalce existing window (not visible from the street) and add (1) light w/d. switch.Details
repalce tile, tubs,counter top & sink at bathroom. also repalce existing window (not visible from the street) and add (1) light w/d. switch. | $6,000 |
| Jun 2, 2005 | Completed final sign-off Sep 2005 | 2620 Sutter St | remodel lower bath & kitchen; replace cabinets & fixtures; replace flr coverings; elec & plumbing asDetails
remodel lower bath & kitchen; replace cabinets & fixtures; replace flr coverings; elec & plumbing as | $12,500 |
| Apr 25, 2002 | Expired or cancelled expired Aug 2002 | 2106 Scott St | replace bath tub with corner jacuzzi-unit#cDetails
replace bath tub with corner jacuzzi-unit#c | $1,000 |