Back to bathroom remodel contractors
Levitch Associates, Inc.
- Based in
- Berkeley
- On San Francisco permits
- Jun 2009 to Aug 2026
- Last 24 months
- 2 permits filed
17 permits since 2000: 15 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 207 days from filing to permit and 243 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2018 | Never finaled issued May 2019, no final | 508 Connecticut St | second fl addition (993sf) with roof deck, add 4 baths,excavate crawlspace to create garage for 2 parking spaces, 1 bicycle space and basement living with storage areasDetails
second fl addition (993sf) with roof deck, add 4 baths,excavate crawlspace to create garage for 2 parking spaces, 1 bicycle space and basement living with storage areas | $284,000 |
| Dec 4, 2014 | Completed final sign-off Jun 2016 | 458 Victoria St | single story horizontal addition at rear, move kitchen from upper floor to lower floor, old kitchen to become bedroom. change tub to shower at lower bath.Details
single story horizontal addition at rear, move kitchen from upper floor to lower floor, old kitchen to become bedroom. change tub to shower at lower bath. | $65,000 |
| Jun 8, 2009 | Completed final sign-off Oct 2009 | 168 Andover St | create new 1/2 bath at upper floor with skylight. expand closets at upper floor within existing roof linen. add central heating.Details
create new 1/2 bath at upper floor with skylight. expand closets at upper floor within existing roof linen. add central heating. | $10,000 |