- 22 permits filed
485 permits since 2000: 325 completed, 24 in progress, 65 never finaled, 71 expired or cancelled.
Of the 65 never-finaled permits, 12 are 3 to 5 years old, 17 are 5 to 10 years old, 36 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Roof deck permits
15 roof deck permits: 13 completed, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 165 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2024 | Completed final sign-off Apr 2024 | 150 Randall St | change material type for railings - pa# 201704033878. cable rail to glass panel at roof deck @ front of bldgDetails
change material type for railings - pa# 201704033878. cable rail to glass panel at roof deck @ front of bldg | |
| Aug 8, 2019 | Completed final sign-off Nov 2021 | 1533 Pacific Av | per approved variance build separation of rear building 2 stories with 1-hour separation construction @ all demising walls. add kitchen to second fl. finish previously approved spiral stair & roof deck. add fire rated cabinet to meters in exist corridor.Details
per approved variance build separation of rear building 2 stories with 1-hour separation construction @ all demising walls. add kitchen to second fl. finish previously approved spiral stair & roof deck. add fire rated cabinet to meters in exist corridor. | $25,000 |
| Jan 18, 2018 | Expired or cancelled cancelled Jan 2026 | 2536 Greenwich St | minor framing (non-structural) in ceiling and sheetrock patchong for new electrical ceiling lights throughout house. new electrival wiring throughout. add hose bib on roof deck.Details
minor framing (non-structural) in ceiling and sheetrock patchong for new electrical ceiling lights throughout house. new electrival wiring throughout. add hose bib on roof deck. | |
| Jun 7, 2017 | Completed final sign-off Jun 2018 | 585 Ortega St | investigate leak and potential dry rot. apply epoxy coating over roof deck including water proof membrane. 150 sq ft.Details
investigate leak and potential dry rot. apply epoxy coating over roof deck including water proof membrane. 150 sq ft. | $5,000 |
| Nov 29, 2011 | Never finaled issued May 2013, no final | 1535 Pacific Av | remodel current kitchen & bathrooms. add (2) 1/2 bathrooms & bedrooms. add roof deck. add 1 car space. enclose & remove an exterior staircase. add a pentroom for deck. replace skylight. sprinklers under separate permit.Details
remodel current kitchen & bathrooms. add (2) 1/2 bathrooms & bedrooms. add roof deck. add 1 car space. enclose & remove an exterior staircase. add a pentroom for deck. replace skylight. sprinklers under separate permit. | $200,000 |
| May 29, 2009 | Completed final sign-off Nov 2009 | 2762 Union St | dryrot repair less than 50% 1 ceiling joist & 1 post waterproof deck walkway. deck measures approx 8'x10' repair work only. all work is non structural only.Details
dryrot repair less than 50% 1 ceiling joist & 1 post waterproof deck walkway. deck measures approx 8'x10' repair work only. all work is non structural only. | $5,100 |
| May 28, 2009 | Completed final sign-off Jun 2009 | 400 Avila St | work @ unit# 105 only. add 1 overflor drain on roof deck. patch wall around over flow drain. additional to (e) drain @ side.Details
work @ unit# 105 only. add 1 overflor drain on roof deck. patch wall around over flow drain. additional to (e) drain @ side. | $600 |
| May 7, 2009 | Completed final sign-off Jun 2009 | 400 Avila St | work @ unit# 105 only. replace roof deck surface boards in kind. replace kitchen cabinets. non structural work. in kind. 8 linear ft. no lighting.Details
work @ unit# 105 only. replace roof deck surface boards in kind. replace kitchen cabinets. non structural work. in kind. 8 linear ft. no lighting. | $4,400 |
| Jul 1, 2008 | Completed final sign-off Dec 2008 | 2829 Steiner St | revision to pa# 2008-0211-4504. revision of stairs from 3/f to roof deck. remove ceiling joists @ rear bedrom location.Details
revision to pa# 2008-0211-4504. revision of stairs from 3/f to roof deck. remove ceiling joists @ rear bedrom location. | $1,000 |
| Feb 11, 2008 | Completed final sign-off Dec 2008 | 2829 Steiner St | new roof deck & stair penthouse to roof. new downlights (louvered) @ roof deck windscreen (glass) over ipe railingDetails
new roof deck & stair penthouse to roof. new downlights (louvered) @ roof deck windscreen (glass) over ipe railing | $20,000 |
| Jan 30, 2008 | Completed final sign-off May 2008 | 941 North Point St | construct new roof deck and spiral staircase per plan.Details
construct new roof deck and spiral staircase per plan. | $25,000 |
| Mar 20, 2007 | Completed final sign-off Jan 2008 | 2665 Leavenworth St | new roof deck over 3rd level, new entry door at landing between 2nd and 3rd level units to create roof access from 1 unit only. structure was approved separatelyDetails
new roof deck over 3rd level, new entry door at landing between 2nd and 3rd level units to create roof access from 1 unit only. structure was approved separately | $10,000 |
| Feb 20, 2007 | Completed final sign-off Nov 2007 | 52 Iris Av | new roof deck. new private stair to roof deck per planDetails
new roof deck. new private stair to roof deck per plan | $25,000 |
| Feb 8, 2007 | Completed final sign-off Sep 2007 | 57 Iris Av | add new private 400 sq ft roof deck and new private access stair from unit 2 to roof deck. max 4'0" above extg parapetDetails
add new private 400 sq ft roof deck and new private access stair from unit 2 to roof deck. max 4'0" above extg parapet | $25,000 |
| Jun 30, 2006 | Completed final sign-off Mar 2008 | 2328 Francisco St | horizontal & vertical addition at rear (20' at 1st flr. w/ roof deck, 8' at 2nd & 3rd floors) balcony at third floor, roof deck over 3rd floor. new conditioned space & full bath at 1st floor.Details
horizontal & vertical addition at rear (20' at 1st flr. w/ roof deck, 8' at 2nd & 3rd floors) balcony at third floor, roof deck over 3rd floor. new conditioned space & full bath at 1st floor. | $300,000 |