Level 5
- Based in
- Brisbane
- On San Francisco permits
- Sep 2011 to Jun 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 5 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 316 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2013 | Never finaled issued Jul 2014, no final | 838 Clipper Tr | at existing third story, expand existing bedroom over existing deck at south side of bldg. add two new windows and one new door. replace guardrail at third story deck.Details
at existing third story, expand existing bedroom over existing deck at south side of bldg. add two new windows and one new door. replace guardrail at third story deck. | $52,000 |