Back to bathroom remodel contractors
Level 10 Construction Lp
- Based in
- Sunnyvale
- On San Francisco permits
- Apr 2012 to Dec 2025
- Last 24 months
- 4 permits filed
245 permits since 2000: 206 completed, 4 in progress, 13 never finaled, 22 expired or cancelled.
Of the 13 never-finaled permits, 1 is 3 to 5 years old, 11 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 30 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 26, 2025 | In progress issued Dec 2025 | 1317 Kansas St | 2nd/f unit: remodel kitchen, demo cabinetry, intall new. new code compliant plumbing & electrical fixtures. remodel bathroom, demo e) bathrooom fixtures & install new, new code compliant plumbing & electrical fixtures. new closet doors, split e) closet into 2.Details
2nd/f unit: remodel kitchen, demo cabinetry, intall new. new code compliant plumbing & electrical fixtures. remodel bathroom, demo e) bathrooom fixtures & install new, new code compliant plumbing & electrical fixtures. new closet doors, split e) closet into 2. | $10,000 |
| Sep 2, 2022 | Completed final sign-off Oct 2022 | 181 Fremont St | unit # 60-c: r & r existing tiled walls in unit bathroom. maintain accessibility requirement at time of original construction.Details
unit # 60-c: r & r existing tiled walls in unit bathroom. maintain accessibility requirement at time of original construction. | $12,000 |
| Sep 2, 2022 | Completed final sign-off Oct 2022 | 181 Fremont St | unit #55-d: remove and replace tiled walls in unit bathroom. maintain accessibility requirements at time of original construction.Details
unit #55-d: remove and replace tiled walls in unit bathroom. maintain accessibility requirements at time of original construction. | $12,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 181 Fremont St | remove and restore existing tiled walls in bathroom. maintain accessibility requirements at time or original construction.Details
remove and restore existing tiled walls in bathroom. maintain accessibility requirements at time or original construction. | $12,000 |
| Jul 15, 2022 | Completed final sign-off Sep 2022 | 181 Fremont St | remove and replace existing existing tiled walls in bathroom. maintain accessibility requirements at time of original construction.Details
remove and replace existing existing tiled walls in bathroom. maintain accessibility requirements at time of original construction. | $12,000 |
| Jun 8, 2022 | Completed final sign-off Aug 2022 | 181 Fremont St | unit 63b: refurbish and restore existing tiled walls in bathroom #2. maintain accessibility requirements at time of original construction.Details
unit 63b: refurbish and restore existing tiled walls in bathroom #2. maintain accessibility requirements at time of original construction. | $12,000 |
| Jun 8, 2022 | Completed final sign-off Sep 2022 | 181 Fremont St | unit 55b: refurbish and restore existing tiled walls in the unit bathroom # 2. maintain accessibility requirements at time of original construction.Details
unit 55b: refurbish and restore existing tiled walls in the unit bathroom # 2. maintain accessibility requirements at time of original construction. | $12,000 |
| Jun 8, 2022 | Completed final sign-off Aug 2022 | 181 Fremont St | unit 58c: refurbish and restore existing tile walls in the unit bathroom #2. maintain accessibility requirements at time of original construction.Details
unit 58c: refurbish and restore existing tile walls in the unit bathroom #2. maintain accessibility requirements at time of original construction. | $12,000 |
| Apr 21, 2022 | Completed final sign-off Jul 2022 | 181 Fremont St | unit # 67-b: r and r existing tiled walls in unit bathroom #2. #3. maintain accessibility requirements at time of original construction.Details
unit # 67-b: r and r existing tiled walls in unit bathroom #2. #3. maintain accessibility requirements at time of original construction. | $12,000 |
| Apr 21, 2022 | Completed final sign-off Aug 2022 | 181 Fremont St | unit #64-b: r & r existing tile walls in unit #2 bathroom. maintain accessibility requirements at time of original construction.Details
unit #64-b: r & r existing tile walls in unit #2 bathroom. maintain accessibility requirements at time of original construction. | $12,000 |
| Apr 21, 2022 | Expired or cancelled cancelled Mar 2026 | 181 Fremont St | unit #65-b: r & r tile walls in unit bathroom #2. maintain accessibility requirements at original time of construction.Details
unit #65-b: r & r tile walls in unit bathroom #2. maintain accessibility requirements at original time of construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | unit 63d: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 63d: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Oct 2022 | 181 Fremont St | unit 61b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 61b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Nov 2021 | 181 Fremont St | unit 65d: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 65d: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Jul 2022 | 181 Fremont St | unit 67c: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 67c: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Sep 2022 | 181 Fremont St | remove and replace tiled walls in the unit bathroomDetails
remove and replace tiled walls in the unit bathroom | $12,000 |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | r&r existing tiled walls in the unit bathroom. maintain accessiblities at shower. ste 63cDetails
r&r existing tiled walls in the unit bathroom. maintain accessiblities at shower. ste 63c | $12,000 |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | remove and replace existing tiled walls in the unit bathrooms, maintain accessibility required at thime of construction.Details
remove and replace existing tiled walls in the unit bathrooms, maintain accessibility required at thime of construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Jul 2022 | 181 Fremont St | unit 68b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 68b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Never finaled issued Jul 2021, no final | 181 Fremont St | unit 68a: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 68a: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Nov 2021 | 181 Fremont St | unit 64a: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 64a: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Aug 2022 | 181 Fremont St | unit 62b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction.Details
unit 62b: remove/replace (e) tiled walls in unit bathroom, maintain accessibility requirements @ time of original construction. | $12,000 |
| Jul 16, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | r&r existing tiled walls in the unit bathroom. maintain accessiblities at shower. ste 65cDetails
r&r existing tiled walls in the unit bathroom. maintain accessiblities at shower. ste 65c | $12,000 |
| May 6, 2021 | Completed final sign-off Nov 2021 | 181 Fremont St | unit 64d: r & r existing tiled walls in the unit bathroomDetails
unit 64d: r & r existing tiled walls in the unit bathroom | $12,000 |
| May 6, 2021 | Never finaled issued May 2021, no final | 181 Fremont St | unit 54a -r & r existing tiled walls in the unit bathroomDetails
unit 54a -r & r existing tiled walls in the unit bathroom | $12,000 |
| May 6, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | unit 63a: r & r existing tiled walls in the unit bathroomDetails
unit 63a: r & r existing tiled walls in the unit bathroom | $12,000 |
| May 6, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | unit 54g: r & r existing tiled walls in the unit bathroomDetails
unit 54g: r & r existing tiled walls in the unit bathroom | $12,000 |
| May 6, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | unit 55a: r & r existing tiled walls in the unit bathroomDetails
unit 55a: r & r existing tiled walls in the unit bathroom | $12,000 |
| May 6, 2021 | Completed final sign-off Nov 2021 | 181 Fremont St | unit 54l -r&r existing tiled walls in the unit bathroomDetails
unit 54l -r&r existing tiled walls in the unit bathroom | $12,000 |
| May 5, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | r & r existing tiled walls in the unit bathroom. unit 56aDetails
r & r existing tiled walls in the unit bathroom. unit 56a | $12,000 |
| May 5, 2021 | Completed final sign-off Jan 2022 | 181 Fremont St | remove and replace tiled walls in unit bathroomDetails
remove and replace tiled walls in unit bathroom | $12,000 |
| May 5, 2021 | Completed final sign-off Nov 2021 | 181 Fremont St | remove and replace e tiled walls in unit bathroomDetails
remove and replace e tiled walls in unit bathroom | $12,000 |
| May 5, 2021 | Completed final sign-off Nov 2021 | 181 Fremont St | r & r existing tiled walls in the unit bathroom. unit 56cDetails
r & r existing tiled walls in the unit bathroom. unit 56c | $12,000 |
| Apr 6, 2018 | Completed final sign-off May 2021 | 181 Fremont St | 25th revision to 201711073346 for ti revisions include bathroom design, food service boh mep maher naDetails
25th revision to 201711073346 for ti revisions include bathroom design, food service boh mep maher na | |
| Jun 10, 2013 | Expired or cancelled expired Jul 2018 | 2901 Broadway | basement: add laundry, art storage, storage. 1st fl: add theater, remodel 3 bathrooms, 2nd fl: remodel kitchen, remodel rooms, 3rd fl: remodel rooms, remodel 2 baths, no change to bldg envelope. mezzanie move (e) bath & bed add pool. ** maher: compliance with ordinance no# 155-13 not required **Details
basement: add laundry, art storage, storage. 1st fl: add theater, remodel 3 bathrooms, 2nd fl: remodel kitchen, remodel rooms, 3rd fl: remodel rooms, remodel 2 baths, no change to bldg envelope. mezzanie move (e) bath & bed add pool. ** maher: compliance with ordinance no# 155-13 not required ** | $2,000,000 |