Back to bathroom remodel contractors
Leonard F Pusing Const
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Mar 2020
- Last 24 months
- 0 permits filed
51 permits since 2000: 41 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 130 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 1, 2017 | Completed final sign-off Jul 2017 | 1771 Greenwich St | add half bathroom and laundry closet on 1st flrDetails
add half bathroom and laundry closet on 1st flr | $10,000 |
| Jul 31, 2015 | Completed final sign-off Jun 2017 | 2746 Union St | renovation bathroom standing shower, remove/replace toilet bowl, pedestal sink, floor tiling, shower fixtures. no alteration on (e) framing.Details
renovation bathroom standing shower, remove/replace toilet bowl, pedestal sink, floor tiling, shower fixtures. no alteration on (e) framing. | $12,000 |
| Jun 19, 2015 | Completed final sign-off Jun 2016 | 551 Dewey Bl | g/f -remove existing illegal kitchen in basement area, stove, microwave, refrig., counter, sink, etc. and to legalize the bathroom.Details
g/f -remove existing illegal kitchen in basement area, stove, microwave, refrig., counter, sink, etc. and to legalize the bathroom. | $1,500 |
| Jun 11, 2012 | Completed final sign-off Jul 2012 | 1771 Greenwich St | dryrot repair. front 2nd floor window, exterior, wood trimming, and window sil plate remove /replace (24'x30" (1"x2) (wood trimming). and left side cornor of the house, 1st floor. remove/replace, window wood trimming (2'x3') (1'x6" (wit) all exterior repair. (bathroom area only).Details
dryrot repair. front 2nd floor window, exterior, wood trimming, and window sil plate remove /replace (24'x30" (1"x2) (wood trimming). and left side cornor of the house, 1st floor. remove/replace, window wood trimming (2'x3') (1'x6" (wit) all exterior repair. (bathroom area only). | $2,180 |
| Dec 21, 2009 | Completed final sign-off Mar 2010 | 1680 Lombard St | unit #3 bathroom, upgrade wall shower tiles, flooring ceramic tiles, re-install back existing toilet bowl (1) , pedestal sink (1) and covder water proof board on opened wall only.Details
unit #3 bathroom, upgrade wall shower tiles, flooring ceramic tiles, re-install back existing toilet bowl (1) , pedestal sink (1) and covder water proof board on opened wall only. | $3,800 |
| Nov 8, 2006 | Completed final sign-off Mar 2007 | 2055 Greenwich St | renovation on master bathroom. remove (e) shower wall tiles, remove/replace 4x4 framing floor tiles 5x5. remove/replace lavatory sink, top & painting. no structural work. remodel master bathroom.Details
renovation on master bathroom. remove (e) shower wall tiles, remove/replace 4x4 framing floor tiles 5x5. remove/replace lavatory sink, top & painting. no structural work. remodel master bathroom. | $8,500 |