Leon Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2009 to Mar 2013
- Last 24 months
- 0 permits filed
14 permits since 2000: 11 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 5 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 7, 2013 | Expired or cancelled expired Sep 2015 | 61 Henry St | replace rear stairs landing board approx 4'x8' by 2x6 redwood deck board above existing joist due to dry rot, as requested by housing inspection; to comply with nov 201387081 and 200796957 (partial scope only)Details
replace rear stairs landing board approx 4'x8' by 2x6 redwood deck board above existing joist due to dry rot, as requested by housing inspection; to comply with nov 201387081 and 200796957 (partial scope only) | $500 |
| Jul 16, 2009 | Completed final sign-off Jul 2009 | 195 Bepler St | replace decks boards (all) @upper & lower rear decks with trex/sister existing joist as neded with hanger no post-beams-changes or repairs. repair in kind, uner 50%.Details
replace decks boards (all) @upper & lower rear decks with trex/sister existing joist as neded with hanger no post-beams-changes or repairs. repair in kind, uner 50%. | $2,500 |