Lemus Construction Inc
- Based in
- Oakland
- On San Francisco permits
- Aug 2022 to Aug 2026
- Last 24 months
- 6 permits filed
15 permits since 2000: 6 completed, 6 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 5 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Aug 2026 | 922 Carolina St | partial interior renovation: 1st fl. kitchen remodel. relocate e. dishwasher, new wing wall & additional cabinetry, new mechanical exhaust at ranges. replace e. incondesant recessed lighting with new led lighing at kitchen, bedroom & bathroom. add ev charger. replace existing knob & tube wiringDetails
partial interior renovation: 1st fl. kitchen remodel. relocate e. dishwasher, new wing wall & additional cabinetry, new mechanical exhaust at ranges. replace e. incondesant recessed lighting with new led lighing at kitchen, bedroom & bathroom. add ev charger. replace existing knob & tube wiring | $40,000 |
| Dec 23, 2025 | Completed final sign-off Sep 2026 | 1437 Cabrillo St | 1st floor: add great room with kitchenette, bedroom and bathroomDetails
1st floor: add great room with kitchenette, bedroom and bathroom | $98,000 |
| Mar 7, 2025 | Completed final sign-off Apr 2025 | 1800 Turk St | unit #305: in kind bathroom remodel in primary residential on 4th flr of building. bathroom is approx. 90"x 58". no changes in layout, flr plan, & no movement of walls. no changes to door or windows. work includes removing old bathtub, sink toilet and bathroom floor tiles. install new shower pan,Details
unit #305: in kind bathroom remodel in primary residential on 4th flr of building. bathroom is approx. 90"x 58". no changes in layout, flr plan, & no movement of walls. no changes to door or windows. work includes removing old bathtub, sink toilet and bathroom floor tiles. install new shower pan, | $15,880 |