Back to bathroom remodel contractors
Lemus Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2008 to Aug 2026
- Last 24 months
- 23 permits filed
142 permits since 2000: 134 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 never finaled. Typically 0 days from filing to permit and 59 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2021 | Completed final sign-off Sep 2021 | 220 Santa Rosa Av | bathroom remodel: replace plumbing fixtures and tiles iwth new, upgrade electrical. remove and rpelace window with new. all work will be performed inkind and there will be no structural changes.Details
bathroom remodel: replace plumbing fixtures and tiles iwth new, upgrade electrical. remove and rpelace window with new. all work will be performed inkind and there will be no structural changes. | $20,000 |
| Apr 13, 2017 | Completed final sign-off Jun 2017 | 58 Reddy St | remodel bathroom/2nd story; bring electrical & bathroom up to code; no structural changes; same layout.Details
remodel bathroom/2nd story; bring electrical & bathroom up to code; no structural changes; same layout. | $10,000 |
| May 27, 2015 | Completed final sign-off Jul 2015 | 657 Naples St | revision to permit 201505186559l new work; sister cut floor joist, repair wall framing, replace 1 existing window,install tiles & sheetrock(not visible from street)all work related to bath remodelDetails
revision to permit 201505186559l new work; sister cut floor joist, repair wall framing, replace 1 existing window,install tiles & sheetrock(not visible from street)all work related to bath remodel | $12,000 |
| May 18, 2015 | Completed final sign-off Jul 2015 | 657 Naples St | at main common bathroom, remove tile flooring and replace with new. repair dryrot at subfloor approximately 9 sq ft . replace sink.Details
at main common bathroom, remove tile flooring and replace with new. repair dryrot at subfloor approximately 9 sq ft . replace sink. | $4,000 |
| Apr 3, 2012 | Completed final sign-off Apr 2012 | 250 11th St | to comply with complaint # 201209101. repair fire damage in bathroom. replace bathroom window not visible from street. window replacement "in kind". max u -factor = 0.40Details
to comply with complaint # 201209101. repair fire damage in bathroom. replace bathroom window not visible from street. window replacement "in kind". max u -factor = 0.40 | $1,000 |
| May 12, 2009 | Never finaled issued May 2009, no final | 1646 38th Av | remove and replace bathroom tile, walls & flooring. all work is non-structural. same size and location.Details
remove and replace bathroom tile, walls & flooring. all work is non-structural. same size and location. | $3,000 |