Permit GraphShortlistSan Francisco building permits since 2000

Leisure Life Walk In Tubs And Showers

Contractor license
956300
State license record
Based in
Antioch
On San Francisco permits
May 2014 to Sep 2023
Last 24 months
0 permits filed

19 permits since 2000: 10 completed, 9 never finaled.

Of the 9 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Bathroom remodel permits

AllBathroom remodel 5

5 bathroom remodel permits: 2 completed, 3 never finaled. Typically 0 days from filing to permit and 24 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Feb 12, 2021Never finaled
issued Feb 2021, no final
1460 Webster Stremove existing bath tub w/ shower and replace with a new walkin tub. hook up to existing plumbing. add a gfi circuit 20amps. no ther changes.
Details
Permit
202102124616
Permit issued
Feb 12, 2021

remove existing bath tub w/ shower and replace with a new walkin tub. hook up to existing plumbing. add a gfi circuit 20amps. no ther changes.

Open the permit page

$14,000
Aug 31, 2018Never finaled
issued Aug 2018, no final
2515 26th Avwork at upstairs 2nd floor hall bathroom. remove existing bathtub w/ shower and replace with a new walk-in tub. hook up to existing plumbing. add a gfci circuit (20a). no other changes and no alterations to walls.
Details
Permit
201808318900
Permit issued
Aug 31, 2018

work at upstairs 2nd floor hall bathroom. remove existing bathtub w/ shower and replace with a new walk-in tub. hook up to existing plumbing. add a gfci circuit (20a). no other changes and no alterations to walls.

Open the permit page

$8,200
May 30, 2018Completed
final sign-off Jun 2018
527 35th Avremove existing bath tub with shower and replace with a new walk in tub, hook up to existing plumbing, add a gfi circuit 20 amps. no other changes.
Details
Permit
201805300480
Permit issued
May 30, 2018
Final sign-off
Jun 12, 2018

remove existing bath tub with shower and replace with a new walk in tub, hook up to existing plumbing, add a gfi circuit 20 amps. no other changes.

Open the permit page

$6,000
Apr 8, 2015Never finaled
issued Apr 2015, no final
2224 Ortega Stremove existing bath tub & all related debris to install new walk-in bath-tub.
Details
Permit
201504083149
Permit issued
Apr 8, 2015

remove existing bath tub & all related debris to install new walk-in bath-tub.

Open the permit page

$5,000
Dec 4, 2014Completed
final sign-off Jan 2015
311 Harkness Avreplace existing bath tub with a walk in bath tub, no changes except to add 30 amp gfi breaker.
Details
Permit
201412043042
Permit issued
Dec 4, 2014
Final sign-off
Jan 9, 2015

replace existing bath tub with a walk in bath tub, no changes except to add 30 amp gfi breaker.

Open the permit page

$5,000