Back to bathroom remodel contractors
Leeward Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2020
- Last 24 months
- 0 permits filed
65 permits since 2000: 34 completed, 12 never finaled, 19 expired or cancelled.
Of the 12 never-finaled permits, 3 are 5 to 10 years old, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 1 completed, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 8 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 8, 2019 | Completed final sign-off Oct 2019 | 683 Teresita Bl | replace 4 windows at back of bldg. no winodws visible from street. with new milgard fiberglass windows, into existing frames. all windows insulated low e glass. bath window tempered. bedroom window to conform with egress requirements. max u factor 0.32Details
replace 4 windows at back of bldg. no winodws visible from street. with new milgard fiberglass windows, into existing frames. all windows insulated low e glass. bath window tempered. bedroom window to conform with egress requirements. max u factor 0.32 | $11,500 |
| Nov 24, 2015 | Never finaled issued Nov 2015, no final | 227 Laguna St | revise pa#201401216670: revise (e) kitchen @ upper unit - not bathroom, work to include new countertops, drawer & door fronts, (e) cabinets to remain, new sink & faucet, change downdraft hood to above range hood. new laminate flooring (e) plumbing & electrical no changes.Details
revise pa#201401216670: revise (e) kitchen @ upper unit - not bathroom, work to include new countertops, drawer & door fronts, (e) cabinets to remain, new sink & faucet, change downdraft hood to above range hood. new laminate flooring (e) plumbing & electrical no changes. | $9,000 |
| Dec 29, 2009 | Expired or cancelled cancelled Jul 2011 | 1988 Greenwich St | minor renovation to 2nd floor unit including new beam at north/south kitchen wall, new master bathroom shower surround & new accent lighting. no work on 1st & 3rd floorsDetails
minor renovation to 2nd floor unit including new beam at north/south kitchen wall, new master bathroom shower surround & new accent lighting. no work on 1st & 3rd floors | $15,000 |
| Jan 9, 2007 | Expired or cancelled cancelled Nov 2007 | 1253 Portola Dr | complete work to hobby room instalation of insulation and finish surfues wall and flooring. complete installation of bathroom, toilet, vanity, chower stell, vent fan, .liaghting.Details
complete work to hobby room instalation of insulation and finish surfues wall and flooring. complete installation of bathroom, toilet, vanity, chower stell, vent fan, .liaghting. | $15,000 |
| Mar 5, 2004 | Never finaled issued Mar 2004, no final | 530 Edinburgh St | repair broken windows, remodel kitchen, bath, new cabinets, appliances, vinyl sheet flooring, replacDetails
repair broken windows, remodel kitchen, bath, new cabinets, appliances, vinyl sheet flooring, replac | $35,000 |
| Dec 1, 2001 | Expired or cancelled expired Apr 2002 | 317 Page St | revision to pa #200009069834, revise wall layout of bathroom remodel.Details
revision to pa #200009069834, revise wall layout of bathroom remodel. | |
| Mar 30, 2000 | Expired or cancelled expired Sep 2000 | 1380 Filbert St | repair rot damage to east bath wall & flooring,replace damaged framing,replace kitchen cab, countertDetails
repair rot damage to east bath wall & flooring,replace damaged framing,replace kitchen cab, countert |