Back to bathroom remodel contractors
Lee Family Corp
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Aug 2026
- Last 24 months
- 59 permits filed
644 permits since 2000: 182 completed, 28 in progress, 416 never finaled, 18 expired or cancelled.
Of the 416 never-finaled permits, 43 are 3 to 5 years old, 100 are 5 to 10 years old, 273 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 5
- Commercial 0
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 1 in progress, 1 expired or cancelled. Typically 2 days from filing to permit and 140 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2025 | In progress issued Oct 2026 | 89 Farallones St | comply to nov#202536989 & 202536877. new dwelling unit(adu)(48a) per government code section 65852.2 at 1st floor, new unit included new bedroom, bathroom, home office and kitchen. legalize existing deck and stairs as yard access. legalize rear 1-story addition.Details
comply to nov#202536989 & 202536877. new dwelling unit(adu)(48a) per government code section 65852.2 at 1st floor, new unit included new bedroom, bathroom, home office and kitchen. legalize existing deck and stairs as yard access. legalize rear 1-story addition. | $75,000 |
| Aug 13, 2025 | Expired or cancelled expired Aug 2026 | 1818 Broadway | kitchen remodel: install drywall, flooring, appliances, cabinets, countertops, and plumbing and electrical fixtures. bathroom remodel: install drywall, floor, cabinets, countertops, shower/tub, sink, and plumbing and electrical fixtures. replace and relocate the unit's electircal panel.(all in kind)Details
kitchen remodel: install drywall, flooring, appliances, cabinets, countertops, and plumbing and electrical fixtures. bathroom remodel: install drywall, floor, cabinets, countertops, shower/tub, sink, and plumbing and electrical fixtures. replace and relocate the unit's electircal panel.(all in kind) | $30,000 |
| Jun 28, 2022 | Completed final sign-off Dec 2022 | 833 Filbert St | kitchen & bathroom to be remodeled, 4 windows to be replaced with new ones. not visible from the street, duct less heating systemDetails
kitchen & bathroom to be remodeled, 4 windows to be replaced with new ones. not visible from the street, duct less heating system | $40,000 |
| Feb 8, 2022 | Completed final sign-off Mar 2022 | 3 Willard North St | remodel #3 unit (1) bathroom. replace a bathtub, a vanity, medicine cabinet, toilet, wall lamp, exhaust fan, towel hanger, and tiles, etc. repaint. add 2 electrical outlets.Details
remodel #3 unit (1) bathroom. replace a bathtub, a vanity, medicine cabinet, toilet, wall lamp, exhaust fan, towel hanger, and tiles, etc. repaint. add 2 electrical outlets. | $18,000 |
| Aug 9, 2021 | Completed final sign-off Jan 2022 | 831 Filbert St | kitchen and bath remodel. 6 windows to be replaced with new. replacement max. u-factor = 0.40. not visible lighting h.e. & controlled per cec 150.0(k)Details
kitchen and bath remodel. 6 windows to be replaced with new. replacement max. u-factor = 0.40. not visible lighting h.e. & controlled per cec 150.0(k) | $30,000 |
| May 21, 2018 | Completed final sign-off Aug 2019 | 723 25th Av | 2nd floor kitchen and 2 bath remodel. remove 2 bearing wall at 2nd floor.Details
2nd floor kitchen and 2 bath remodel. remove 2 bearing wall at 2nd floor. | $60,000 |
| Jun 27, 2014 | Completed final sign-off Dec 2014 | 8228 Geary Bl | add family room, bedroom, bathroom on 1st fl of single family dwelling no change at front elevation of buildingDetails
add family room, bedroom, bathroom on 1st fl of single family dwelling no change at front elevation of building | $38,000 |
| Dec 2, 2013 | Completed final sign-off Jan 2014 | 321 Judah St | construct new bathroom at 1st flDetails
construct new bathroom at 1st fl | $12,000 |