Back to bathroom remodel contractors
Lc Remodeling Construction
- Based in
- Daly City
- On San Francisco permits
- Jun 2021 to Aug 2026
- Last 24 months
- 4 permits filed
9 permits since 2000: 4 completed, 3 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 0 days from filing to permit and 243 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Aug 2026 | 239 Brannan St | remodeling master bathroom and hallway bathroom. master remove the bath tub to shower pan to comply with cbc1143a.6Details
remodeling master bathroom and hallway bathroom. master remove the bath tub to shower pan to comply with cbc1143a.6 | $28,980 |
| Jun 2, 2026 | Completed final sign-off Aug 2026 | 239 Brannan St | unit #8c - bathroom remodel, same layout.Details
unit #8c - bathroom remodel, same layout. | $24,900 |
| May 14, 2024 | Completed final sign-off Jan 2025 | 239 Brannan St | unit #17d: remodeling bathroom new walls shower tiles, flooring tiles and heat, shower pan, valves, sink, mirror, painting, ground, sealer. no exterior work.Details
unit #17d: remodeling bathroom new walls shower tiles, flooring tiles and heat, shower pan, valves, sink, mirror, painting, ground, sealer. no exterior work. | $26,820 |
| Jan 5, 2024 | Completed final sign-off Sep 2024 | 1601 Pacific Av | remodeling (2) bathrooms and kitchen cabinet, countertop, faucet, painting.Details
remodeling (2) bathrooms and kitchen cabinet, countertop, faucet, painting. | $56,800 |