Back to bathroom remodel contractors
Lb Construction & Remodeling
- Based in
- San Leandro
- On San Francisco permits
- Jul 2019 to Aug 2025
- Last 24 months
- 2 permits filed
24 permits since 2000: 18 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 11 completed, 1 never finaled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2025 | Completed final sign-off Aug 2025 | 234 Richland Av | bathroom remodel, like for like, no relocation involved. replace vanity, toilet, (e) fan, (e) shower pan and shower. hand replace floor of bath area. run dedicated circuits per code. no layout change.Details
bathroom remodel, like for like, no relocation involved. replace vanity, toilet, (e) fan, (e) shower pan and shower. hand replace floor of bath area. run dedicated circuits per code. no layout change. | $20,000 |
| Oct 20, 2023 | Completed final sign-off Oct 2023 | 414 27th St | window replacement like for like no changes involved 3 windows in total. 2 in living room, 1 in bathroom (non facing frontage)Details
window replacement like for like no changes involved 3 windows in total. 2 in living room, 1 in bathroom (non facing frontage) | $20,000 |
| Jun 5, 2023 | Completed final sign-off Jun 2026 | 1219 Fitzgerald Av | convert lower floor to jadu. 2nd fl kitchen & bathroom remodel. fire damage repair and roof retrofit. units will be added per govt code section 65852.22( and/or section 65852.2 for hybrid adu)Details
convert lower floor to jadu. 2nd fl kitchen & bathroom remodel. fire damage repair and roof retrofit. units will be added per govt code section 65852.22( and/or section 65852.2 for hybrid adu) | $350,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2023 | 2040 Sutter St | bathroom remodeling like for like no relocation involved. replace toilet, replace vanity, replace shower pan, replace existing fan, run dedicated circuits per code.Details
bathroom remodeling like for like no relocation involved. replace toilet, replace vanity, replace shower pan, replace existing fan, run dedicated circuits per code. | $20,000 |
| Apr 20, 2022 | Completed final sign-off Oct 2023 | 1939 Fulton St | kitchen remodel like for like. add 70 amp subpanel. bathroom remodel. adding toilet & sink in half bath.Details
kitchen remodel like for like. add 70 amp subpanel. bathroom remodel. adding toilet & sink in half bath. | $50,000 |
| Apr 28, 2021 | Completed final sign-off Aug 2021 | 221 Clara St | bathroom remodeling like to like, remove replace toliet, replace shower pan , replace double sink vanity, bathroom remodel in kind comply w/150.0(k)5Details
bathroom remodeling like to like, remove replace toliet, replace shower pan , replace double sink vanity, bathroom remodel in kind comply w/150.0(k)5 | $15,000 |
| Mar 5, 2021 | Completed final sign-off Aug 2021 | 2931 20th St | bathroom remodeling like for like, no relocaiton. master: tub & shower replace toilet replace sink, replace existing fan replace 3 recess light. guest tub, replace toilet, replace sink, replace fan.Details
bathroom remodeling like for like, no relocaiton. master: tub & shower replace toilet replace sink, replace existing fan replace 3 recess light. guest tub, replace toilet, replace sink, replace fan. | $30,000 |
| Jan 4, 2021 | Completed final sign-off Jun 2021 | 221 Clara St | #4: bathroom remodel like to like. no any relocation. replace toilet, vanity, tile on floor & wall, fan, lights, shower pan, shower head & gfi.Details
#4: bathroom remodel like to like. no any relocation. replace toilet, vanity, tile on floor & wall, fan, lights, shower pan, shower head & gfi. | $21,000 |
| Oct 7, 2020 | Never finaled issued Dec 2020, no final | 68 Rosemont Pl | remodel master bathroom and add guest bathroom at 3rd fl, replace 1 rear window if needed.Details
remodel master bathroom and add guest bathroom at 3rd fl, replace 1 rear window if needed. | $30,000 |
| Jul 22, 2020 | Completed final sign-off Jun 2021 | 341 Kirkham St | bath room remodel with reloaded new bearing wall, replace vanity and replace toilet, replace tub, replace (e) fan, remove non bearing wall and build new wall with 2x4 studs 16" on center install 4x6 header above doorDetails
bath room remodel with reloaded new bearing wall, replace vanity and replace toilet, replace tub, replace (e) fan, remove non bearing wall and build new wall with 2x4 studs 16" on center install 4x6 header above door | $25,000 |
| Feb 6, 2020 | Completed final sign-off Sep 2020 | 3329 Scott St | remove e laundry area and add a full bath at 2nd fl bedroom. maher not reqDetails
remove e laundry area and add a full bath at 2nd fl bedroom. maher not req | $30,000 |
| Jul 29, 2019 | Completed final sign-off Dec 2019 | 1400 Mission St | unit 810: partial bath remodel, replace tub, mixer valve, tiles on walls/floor, replace vanity. no electrical work to be done. no walls removed.Details
unit 810: partial bath remodel, replace tub, mixer valve, tiles on walls/floor, replace vanity. no electrical work to be done. no walls removed. | $7,000 |