- 0 permits filed
15 permits since 2000: 14 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2020 | Never finaled issued Dec 2020, no final | 1 Shrader St | add receptacle to existing idf room on level 6 to support new server.Details
add receptacle to existing idf room on level 6 to support new server. | $3,000 |
| Apr 24, 2018 | Completed final sign-off Nov 2019 | 1 Shrader St | 4/f: idf closets and low voltage cabling framing, drywall, electrical to supportDetails
4/f: idf closets and low voltage cabling framing, drywall, electrical to support | $250,000 |
| Apr 24, 2018 | Completed final sign-off Nov 2019 | 2250 Hayes St | 4 existing idf rooms, low voltage cabling for existing idf closets,new ac-0 and ac-1.Details
4 existing idf rooms, low voltage cabling for existing idf closets,new ac-0 and ac-1. | $300,000 |
| Apr 24, 2018 | Completed final sign-off Nov 2019 | 2235 Hayes St | floors 3 & 5: drywall, framing, elec, mech work to upgrade idf closets. supports and cabling(low voltage) to connect new (2 ea.) and upgraded idf rooms)Details
floors 3 & 5: drywall, framing, elec, mech work to upgrade idf closets. supports and cabling(low voltage) to connect new (2 ea.) and upgraded idf rooms) | $240,000 |
| Sep 9, 2014 | Completed final sign-off Aug 2016 | 942 Mission St | update labelling of floors and associated room numbers affected by removal of 13th flr, and renaming as 14th flr, added alcove for pg&e gas meter. addition of canopy on mission st as required by planning dept. addition of elec 117 as reqd by pg&e; maher n/aDetails
update labelling of floors and associated room numbers affected by removal of 13th flr, and renaming as 14th flr, added alcove for pg&e gas meter. addition of canopy on mission st as required by planning dept. addition of elec 117 as reqd by pg&e; maher n/a | |
| Sep 9, 2014 | Completed final sign-off Feb 2016 | 942 Mission St | revision to app#201105136051 (s-3). revised fire alarm drawings, smoke control panel to remove reference to 13th floor and relabel as 14th floor and subsequent affected higher floors. corrections/notes on approved drawing s incorporated as required by fire dept. n/a maher ord. # 155-13Details
revision to app#201105136051 (s-3). revised fire alarm drawings, smoke control panel to remove reference to 13th floor and relabel as 14th floor and subsequent affected higher floors. corrections/notes on approved drawing s incorporated as required by fire dept. n/a maher ord. # 155-13 | |
| Jun 13, 2014 | Completed final sign-off Jul 2016 | 942 Mission St | to erect an electric sign "hampton inn"; (sign c)), facing jessie street; compliance with ord 155-13 not requiredDetails
to erect an electric sign "hampton inn"; (sign c)), facing jessie street; compliance with ord 155-13 not required | $3,000 |
| Jun 13, 2014 | Completed final sign-off Jul 2016 | 942 Mission St | to erect 2 electric signs "hampton inn"; (signs d & e)compliance with ord 155-13 not requiredDetails
to erect 2 electric signs "hampton inn"; (signs d & e)compliance with ord 155-13 not required | $8,000 |
| Jun 13, 2014 | Completed final sign-off Aug 2016 | 942 Mission St | to erect a painted "hampton inn";(sign f)compliance with ord 155-13 not requiredDetails
to erect a painted "hampton inn";(sign f)compliance with ord 155-13 not required | $1,000 |
| Jun 13, 2014 | Completed final sign-off Jul 2016 | 942 Mission St | to erect an electric sign "hampton inn" (sign b), facing mission street ; compliance with ord 155-13 not requiredDetails
to erect an electric sign "hampton inn" (sign b), facing mission street ; compliance with ord 155-13 not required | $3,000 |
| Jun 13, 2014 | Completed final sign-off Aug 2016 | 942 Mission St | to erect an electric sign "hampton inn"; sign a, facing mission street: compliance with ord 155-13 not requiredDetails
to erect an electric sign "hampton inn"; sign a, facing mission street: compliance with ord 155-13 not required | $4,000 |
| Apr 4, 2013 | Completed final sign-off Jun 2016 | 948 Mission St | install footing for tower crane. erect tower crane for the prupose of hosting for permit #201105136051s1r1 942 mission street 15 story hotel.Details
install footing for tower crane. erect tower crane for the prupose of hosting for permit #201105136051s1r1 942 mission street 15 story hotel. | $400,000 |
| Nov 9, 2012 | Completed final sign-off Jun 2016 | 948 Mission St | continuous hand-dug underpinning, soldier beam tieback, soldier beam & internal bracing at crane mat.main permit appn. 201211093915Details
continuous hand-dug underpinning, soldier beam tieback, soldier beam & internal bracing at crane mat.main permit appn. 201211093915 | $35,000 |
| Nov 9, 2012 | Completed final sign-off Aug 2016 | 942 Mission St | raker brace shoring at (e) vault on mission street. solider beam tieback shoring on jessie street.Details
raker brace shoring at (e) vault on mission street. solider beam tieback shoring on jessie street. | $30,000 |
| Nov 9, 2012 | Completed final sign-off Jun 2016 | 936 Mission St | continous hand-dug underpinning piers along south side of building. sequential pours are required.Details