Back to bathroom remodel contractors
Lawrence Fraser Construction
- Based in
- Novato
- On San Francisco permits
- Mar 2016 to Aug 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 2 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 7 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2016 | Completed final sign-off Nov 2016 | 512 Rockdale Dr | legalize 1 (e) bedroom, add 1 bedroom and a bathroom at ground floor. reconstruct interior stairs to meet current code. add plywood sheathing at the ground floor and crawl space with required shear connections. add (2) windows at the rear side & east side; not visable to street.Details
legalize 1 (e) bedroom, add 1 bedroom and a bathroom at ground floor. reconstruct interior stairs to meet current code. add plywood sheathing at the ground floor and crawl space with required shear connections. add (2) windows at the rear side & east side; not visable to street. | $40,000 |