Back to bathroom remodel contractors
Law Construction
- Based in
- San Rafael
- On San Francisco permits
- Jul 2001 to Oct 2010
- Last 24 months
- 0 permits filed
17 permits since 2000: 16 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2008 | Completed final sign-off Apr 2008 | 116 Downey St | remodel 1 bathroom to include: new tile, new shower valve, new pocket door frame and shower can light. replace 2 sky lights in kindDetails
remodel 1 bathroom to include: new tile, new shower valve, new pocket door frame and shower can light. replace 2 sky lights in kind | $10,000 |
| Jun 29, 2006 | Completed final sign-off Mar 2007 | 1371 Dolores St | reconfigure g/f unit to add bathroom & living room, move kitchen, add master bathroom & replace kitchen cabinets at upper unit. no expansion of bldg envelope.Details
reconfigure g/f unit to add bathroom & living room, move kitchen, add master bathroom & replace kitchen cabinets at upper unit. no expansion of bldg envelope. | $49,000 |
| Oct 12, 2005 | Completed final sign-off Mar 2006 | 163 Moneta Wy | remodel existing kitchen w new cabinets, appliances, cntrtop sink, tile floor. no structural. remodel exist bath w new tile, sink, toiletDetails
remodel existing kitchen w new cabinets, appliances, cntrtop sink, tile floor. no structural. remodel exist bath w new tile, sink, toilet | $14,000 |
| Jan 22, 2004 | Completed final sign-off Feb 2005 | 1274 Noe St | remodel kitchen and master bedroom and bath, new shear walls and holdowns per plansDetails
remodel kitchen and master bedroom and bath, new shear walls and holdowns per plans | $100,000 |
| Jul 31, 2003 | Completed final sign-off Oct 2003 | 924 Clayton St | convert exsting closet on 2nd fl to install a new bathroomDetails
convert exsting closet on 2nd fl to install a new bathroom | $25,500 |