Lavaughn's Construction
- Based in
- Richmond
- On San Francisco permits
- Feb 2010 to Jan 2018
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 1 days from filing to permit and 129 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 16, 2018 | Completed final sign-off Aug 2018 | 44 Venus St | kitchen & bathroom remodel. kitchen ceiling and walls exposed to stud framing w/exterior walls insulated and 1 window eliminated (not visible from st) from kitchen with reapirs. sheetrock kitchen and (1) pocket door for bathroom and seal off 2nd door to bath from closet. shower stall toDetails
kitchen & bathroom remodel. kitchen ceiling and walls exposed to stud framing w/exterior walls insulated and 1 window eliminated (not visible from st) from kitchen with reapirs. sheetrock kitchen and (1) pocket door for bathroom and seal off 2nd door to bath from closet. shower stall to | $65,000 |
| Nov 30, 2010 | Completed final sign-off Jan 2011 | 233 Tingley St | bath remodel- tear out tile walls/floor, tub to remain, plumb in new fixture, relocate outlet plug & install gfic receptacle. install exhaust fan, new light fixture. hang sheetrock on walls & concete board around tub surround, new toilet,vanity cabinet with top & fixture, tile walls surround & floorDetails
bath remodel- tear out tile walls/floor, tub to remain, plumb in new fixture, relocate outlet plug & install gfic receptacle. install exhaust fan, new light fixture. hang sheetrock on walls & concete board around tub surround, new toilet,vanity cabinet with top & fixture, tile walls surround & floor | $9,850 |