Back to bathroom remodel contractors
Lau Man Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2002 to Sep 2022
- Last 24 months
- 0 permits filed
21 permits since 2000: 17 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 8, 2020 | Completed final sign-off Jun 2021 | 177 Guttenberg St | 2nd floor: remodel kitchen and bathroom. add one new bathroom and two skylights per plan.Details
2nd floor: remodel kitchen and bathroom. add one new bathroom and two skylights per plan. | $33,000 |
| Aug 27, 2014 | Completed final sign-off Oct 2014 | 471 Campbell Av | replace cabinet in kitchen. move electric box in kitchen area. remodel bathroom. no alteration on wall, window and door.Details
replace cabinet in kitchen. move electric box in kitchen area. remodel bathroom. no alteration on wall, window and door. | $28,000 |
| Jan 29, 2008 | Expired or cancelled expired Dec 2008 | 44 Arlington St | top (3rd) floor: update kitchen & bathroom, cabinets, refinish/repair hardwood floors, replace closet doors at dressing room & bedroom, replace most light fixtures, move 1 wall opening at living room, replace 1 window (same size) at stair. replace hot water heater, repair some sheetrock.Details
top (3rd) floor: update kitchen & bathroom, cabinets, refinish/repair hardwood floors, replace closet doors at dressing room & bedroom, replace most light fixtures, move 1 wall opening at living room, replace 1 window (same size) at stair. replace hot water heater, repair some sheetrock. | $25,000 |
| Mar 2, 2007 | Completed final sign-off Apr 2007 | 1360 Green St | work on unit#8 only.bathroom enclosure repair (tile work) non structural .Details
work on unit#8 only.bathroom enclosure repair (tile work) non structural . | $2,000 |
| Feb 26, 2007 | Completed final sign-off Aug 2007 | 2436 Jackson St | bathroom remodel (1) no structural changes.Details
bathroom remodel (1) no structural changes. | $10,000 |