Back to bathroom remodel contractors
Lau Construction Llc
- Based in
- Daly City
- On San Francisco permits
- Dec 2000 to Apr 2025
- Last 24 months
- 1 permit filed
54 permits since 2000: 47 completed, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 17 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2022 | Completed final sign-off Jul 2022 | 326 College Av | remodel bathroom. replace bedroom window (not visible to street) as same in-kind.Details
remodel bathroom. replace bedroom window (not visible to street) as same in-kind. | $20,000 |
| Jun 10, 2020 | Completed final sign-off Sep 2020 | 879 43rd Av | 2nd floor master bathroom remodel as the same kind; remove knob and tube wiring with romex wire for the whole house.Details
2nd floor master bathroom remodel as the same kind; remove knob and tube wiring with romex wire for the whole house. | $21,000 |
| Mar 13, 2020 | Completed final sign-off Mar 2022 | 323 Vienna St | kitchen remodel, bath and laundry. remodel master bath, 5 window replacement at side and rear. replace front siding (visible from st). add new skylight at 2nd fl.Details
kitchen remodel, bath and laundry. remodel master bath, 5 window replacement at side and rear. replace front siding (visible from st). add new skylight at 2nd fl. | $80,000 |
| Oct 4, 2017 | Completed final sign-off Jan 2018 | 2950 Clay St | remodel master bathroom and hallway bathroomDetails
remodel master bathroom and hallway bathroom | $26,000 |
| Jul 11, 2017 | Completed final sign-off Oct 2017 | 2950 Clay St | unit #202: remodel master bathroom and hallway bathroom. construction will be done one bathroom at a time.Details
unit #202: remodel master bathroom and hallway bathroom. construction will be done one bathroom at a time. | $19,000 |
| Jan 11, 2017 | Completed final sign-off Jun 2017 | 2505 Divisadero St | replace entry door solid wood temper glass, replace existing patio door, solid wood, replace existing deck 10 x 12, replace garage door with roll up door allwood, remodel garage bath.Details
replace entry door solid wood temper glass, replace existing patio door, solid wood, replace existing deck 10 x 12, replace garage door with roll up door allwood, remodel garage bath. | $45,000 |
| Jul 18, 2016 | Completed final sign-off Dec 2016 | 39 Boardman Pl | unit 202. remodel master bathroom - replace tub, shower valve, replace toilet, replace vanity sink & faucet. keep existing tub, replace floor & wall tiles. maher naDetails
unit 202. remodel master bathroom - replace tub, shower valve, replace toilet, replace vanity sink & faucet. keep existing tub, replace floor & wall tiles. maher na | $10,000 |
| Sep 22, 2015 | Completed final sign-off Aug 2016 | 1811 18th Av | relocate and legalize illegal full bath on 1st floor per plan; remove illegal bedroom on 1st floor and convert to family room. turn (e) storage into mudroom on 1st floor per planDetails
relocate and legalize illegal full bath on 1st floor per plan; remove illegal bedroom on 1st floor and convert to family room. turn (e) storage into mudroom on 1st floor per plan | $20,000 |
| May 20, 2014 | Completed final sign-off Jun 2015 | 281 Avila St | revision appl.# 201307182135. (n) bar counter at 1st floor. replace (e) door at front facade, repair (e) redwood siding, (n) slab at bathroom on 1st floor. moment frame anchor bolt clarification, replace steel posts beam w/wood post + beam on 1st floor. show(e) roof joists, replace dryrot on 3rd fDetails
revision appl.# 201307182135. (n) bar counter at 1st floor. replace (e) door at front facade, repair (e) redwood siding, (n) slab at bathroom on 1st floor. moment frame anchor bolt clarification, replace steel posts beam w/wood post + beam on 1st floor. show(e) roof joists, replace dryrot on 3rd f | |
| Mar 26, 2014 | Completed final sign-off Apr 2015 | 850 Powell St | proposed work for unit 403 only. remodel 2 existing bathrooms. relocate existing kitchen, convert existing kitchen and bedrooms to a master bedroomDetails
proposed work for unit 403 only. remodel 2 existing bathrooms. relocate existing kitchen, convert existing kitchen and bedrooms to a master bedroom | $35,000 |
| Mar 22, 2013 | Never finaled issued Mar 2013, no final | 218 26th Av | master bath remodel, kitchen ceiling, 6 led recessed can fixturedDetails
master bath remodel, kitchen ceiling, 6 led recessed can fixtured | $12,000 |
| Apr 14, 2010 | Expired or cancelled expired Dec 2012 | 328 Gold Mine Dr | revision to permit#200908104493, structural partial retrofit voluntary & remodel bathroom, basement bath relocation & kitchen w/ re-packaging hvac/furnace in garage.Details
revision to permit#200908104493, structural partial retrofit voluntary & remodel bathroom, basement bath relocation & kitchen w/ re-packaging hvac/furnace in garage. | $10,000 |
| Jul 23, 2009 | Completed final sign-off Oct 2009 | 352 Sutter St | install partition wall, remodel bathroom, install new tiles.Details
install partition wall, remodel bathroom, install new tiles. | $50,000 |
| Jun 26, 2008 | Completed final sign-off Mar 2009 | 1751 Sanchez St | upstair bedrooms remodel install insulation for the 2 bedrooms. replace two windows in the bedrooms.windos not visible from the street. same size u factor max 0.67. install outlets & lites. remodel upstair- bathroom, replace tub, vanity sink & toilet. wall r-13, ceiling r-30 insulation. inspectorDetails
upstair bedrooms remodel install insulation for the 2 bedrooms. replace two windows in the bedrooms.windos not visible from the street. same size u factor max 0.67. install outlets & lites. remodel upstair- bathroom, replace tub, vanity sink & toilet. wall r-13, ceiling r-30 insulation. inspector | $15,000 |
| Sep 20, 2007 | Completed final sign-off Jan 2008 | 576 Huron Av | work to comply with n.o.v. 200709203264. legalize bedroom, bathroom, social room, storage room at rear of garage on ground floor.Details
work to comply with n.o.v. 200709203264. legalize bedroom, bathroom, social room, storage room at rear of garage on ground floor. | $30,000 |
| Aug 7, 2007 | Completed final sign-off Feb 2008 | 1201 California St | remodel master bathroom and remodel hallway bathroom refacing kitchen cabinets only work in unit #102 no structural workDetails
remodel master bathroom and remodel hallway bathroom refacing kitchen cabinets only work in unit #102 no structural work | $25,000 |
| Oct 21, 2005 | Completed final sign-off Apr 2006 | 337 Teresita Bl | remodel bathroom, remove existing tub ,banity, toilet, new fixtures. recessed lighting,remove bathroom windows, same width/shooting in ht. no structural work. replace existing window at reduce size e 4x3 n 3x2 e 3ft from p/lDetails
remodel bathroom, remove existing tub ,banity, toilet, new fixtures. recessed lighting,remove bathroom windows, same width/shooting in ht. no structural work. replace existing window at reduce size e 4x3 n 3x2 e 3ft from p/l | $6,000 |
| Oct 3, 2005 | Completed final sign-off Aug 2006 | 840 Powell St | remodel kitchen & bathroom, drop ceiling for bedroom.Details
remodel kitchen & bathroom, drop ceiling for bedroom. | $18,000 |
| Jun 2, 2004 | Completed final sign-off Oct 2004 | 148 Corwin St | remodel master bathroom & closetDetails
remodel master bathroom & closet | $8,500 |
| Mar 9, 2004 | Expired or cancelled expired May 2007 | 157 Duboce Av | replace kitchen cabinet,kitchen/2 bath windows,vinyl flooring in kitchen/bath,bathtub/toilet/sink inDetails
replace kitchen cabinet,kitchen/2 bath windows,vinyl flooring in kitchen/bath,bathtub/toilet/sink in | $11,000 |