Larson Li Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Mar 2008
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2008 | Completed final sign-off Jun 2008 | 3149 California St | work @ unit# 4e only. remodel kitchen (cabinets), no structure change.Details
work @ unit# 4e only. remodel kitchen (cabinets), no structure change. | $8,171 |
| Oct 12, 2007 | Completed final sign-off Oct 2007 | 563 Webster St | repair back stair and add the hand rail in kind. violation: #20072494.Details
repair back stair and add the hand rail in kind. violation: #20072494. | $4,500 |
| Mar 28, 2005 | Completed final sign-off Mar 2005 | 839 Clay St | repair basement stair. less than 50% replacementDetails
repair basement stair. less than 50% replacement | $550 |
| Nov 3, 2003 | Completed final sign-off Nov 2003 | 1600 Lombard St | repair back stair. repair siding. replace 3 back doors less than 50% in kind.Details
repair back stair. repair siding. replace 3 back doors less than 50% in kind. | $11,000 |
| May 19, 2003 | Completed final sign-off May 2003 | 30 Wayne Pl | repair stair post for nov 200340230Details
repair stair post for nov 200340230 | $1,000 |
| Mar 6, 2002 | Completed final sign-off Mar 2002 | 2701 Larkin St | inspection of temporary wall rec'd before cover(r.tom).sheet rock cover hall walls 100'x8',temporariDetails
inspection of temporary wall rec'd before cover(r.tom).sheet rock cover hall walls 100'x8',temporari | $4,800 |
| Aug 29, 2001 | Completed final sign-off Oct 2001 | 1343 Kearny St | change building side siding insulate sheet rock work in bedrooms & kitchen hallway no structural chaDetails
change building side siding insulate sheet rock work in bedrooms & kitchen hallway no structural cha | $15,000 |
| May 25, 2001 | Completed final sign-off Jun 2001 | 1351 Kearny St | replace building side siding replace apt doorsDetails
replace building side siding replace apt doors | $5,500 |
| Dec 29, 2000 | Completed final sign-off Mar 2001 | 1450 California St | redo building front stucco, change 12 windows and paintDetails
redo building front stucco, change 12 windows and paint | $22,000 |
| Nov 20, 2000 | Completed final sign-off Jan 2001 | 801 Stockton St | fire damage. no structure change. replace wall & ceiling sheet rock. replace floor tile. paint.Details
fire damage. no structure change. replace wall & ceiling sheet rock. replace floor tile. paint. | $18,000 |
| May 16, 2000 | Completed final sign-off May 2000 | 42 Salmon St | repair rear stair and yard fence comply with complaint 200004812Details
repair rear stair and yard fence comply with complaint 200004812 | $6,000 |
| Apr 6, 2000 | Completed final sign-off Oct 2000 | 351 Melrose Av | remodel kitchen and bathroom, change front door, repair deckDetails
remodel kitchen and bathroom, change front door, repair deck | $25,000 |
| Mar 30, 2000 | Completed final sign-off Apr 2000 | 3115 Balboa St | repair or replace existing dry rotten stairs.Details
repair or replace existing dry rotten stairs. | $3,000 |