Larson Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2009 to May 2015
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 3, 2014 | Completed final sign-off Nov 2014 | 400 Liberty St | failing redwood deck boards & railings to be replaced. repair any damage framing. deck to remain same size. replace & repair in kind less than 50% construction.Details
failing redwood deck boards & railings to be replaced. repair any damage framing. deck to remain same size. replace & repair in kind less than 50% construction. | $8,000 |
| Jan 19, 2012 | Completed final sign-off Jul 2012 | 271 Hartford St | comply with nov# 201174994-work to be performed on front yard garage structure, remove deck materials. replace flat, rear portion of roof. replace garage door on front. no work, changes on houseDetails
comply with nov# 201174994-work to be performed on front yard garage structure, remove deck materials. replace flat, rear portion of roof. replace garage door on front. no work, changes on house | $3,500 |