Lapje Roofing Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2017 to Jun 2026
- Last 24 months
- 56 permits filed
181 permits since 2000: 149 completed, 12 in progress, 17 never finaled, 3 expired or cancelled.
Of the 17 never-finaled permits, 4 are 3 to 5 years old, 13 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 1 completed, 1 in progress. Typically 0 days from filing to permit and 8 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2025 | Completed final sign-off Jul 2025 | 325 Lake St | partial removal and application of roofing system on the rear deck only. remove existing roofing system and haul away debris. install new base sheet and mid-ply using heat activated adhesive. install a layer of granulated refrlective cap sheet. install new flashings.Details
partial removal and application of roofing system on the rear deck only. remove existing roofing system and haul away debris. install new base sheet and mid-ply using heat activated adhesive. install a layer of granulated refrlective cap sheet. install new flashings. | $12,500 |
| Dec 19, 2024 | In progress filed Dec 2024, not yet issued | 1370 Revere Av | firewall installation for existing deck installed pressure treated sill plate and iron rod each and of wall amd 4" o.c erect wall 2 x 6 studs 16" oc 1/2 plywood 5/8 typex exterior tated gyp two plywood 15lb. fire reate felt and csDetails
firewall installation for existing deck installed pressure treated sill plate and iron rod each and of wall amd 4" o.c erect wall 2 x 6 studs 16" oc 1/2 plywood 5/8 typex exterior tated gyp two plywood 15lb. fire reate felt and cs |