Back to bathroom remodel contractors
Lao's Construction
- Based in
- Oakland
- On San Francisco permits
- Jun 2001 to Mar 2020
- Last 24 months
- 0 permits filed
30 permits since 2000: 28 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 14 completed. Typically 4 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 29, 2019 | Completed final sign-off Sep 2021 | 1893 Oakdale Av | add dwelling unit c on 1st fl with 2 bedrooms, 2 3 fixtures baths, kitchen, dining and living room per ord 162-16Details
add dwelling unit c on 1st fl with 2 bedrooms, 2 3 fixtures baths, kitchen, dining and living room per ord 162-16 | $40,000 |
| Mar 29, 2018 | Completed final sign-off Apr 2019 | 1887 34th Av | add one adu unit @ ground floor per ord# 162-16. 1st floor (n) unit with two bedrooms, one bath and one kitchen. 2nd floor remodel (e) kitchen & bathroom, add 1/2 bath.Details
add one adu unit @ ground floor per ord# 162-16. 1st floor (n) unit with two bedrooms, one bath and one kitchen. 2nd floor remodel (e) kitchen & bathroom, add 1/2 bath. | $55,000 |
| Oct 20, 2017 | Completed final sign-off Oct 2018 | 32 Springfield Dr | convert (e) bath into 2-bathrm. add a shower to (e) toilet rm. relocate kitchen & dining rm. remove all lath & plaster. change some windows to double glass windows. 1st fl: new bathroom & family room. new furnace and water heater.Details
convert (e) bath into 2-bathrm. add a shower to (e) toilet rm. relocate kitchen & dining rm. remove all lath & plaster. change some windows to double glass windows. 1st fl: new bathroom & family room. new furnace and water heater. | $88,000 |
| May 23, 2017 | Completed final sign-off Sep 2017 | 2352 Taraval St | remodel dexisting 3/f apt 2352. relocate new kitchen in dining rm area. convert existing kitchen to bedrooom. change existing bath rm fixturesDetails
remodel dexisting 3/f apt 2352. relocate new kitchen in dining rm area. convert existing kitchen to bedrooom. change existing bath rm fixtures | $28,000 |
| Apr 28, 2017 | Completed final sign-off Aug 2018 | 627 Moscow St | to add one bed room, one family room, 2 full bathrooms & laundry room on (e) ground floor per planDetails
to add one bed room, one family room, 2 full bathrooms & laundry room on (e) ground floor per plan | $70,000 |
| Dec 29, 2016 | Completed final sign-off Dec 2019 | 123 Valmar Tr | horizontal addtion of two story rear addition w/two (n) bedroom & (n) full bath on 1st flr, (n) living/dinning room on 2nd flr and (n) deck.Details
horizontal addtion of two story rear addition w/two (n) bedroom & (n) full bath on 1st flr, (n) living/dinning room on 2nd flr and (n) deck. | $80,000 |
| Oct 30, 2015 | Completed final sign-off Feb 2016 | 4502 Anza St | apt 2 - interior remodel. remodel existing unit at 2 fl. remodel e kitchen, bath, bedrooms. change living rm, bedroom, change e furnace. add skylight, change rear windows to casement windowsDetails
apt 2 - interior remodel. remodel existing unit at 2 fl. remodel e kitchen, bath, bedrooms. change living rm, bedroom, change e furnace. add skylight, change rear windows to casement windows | $28,000 |
| Jul 2, 2014 | Completed final sign-off Oct 2017 | 522 Moscow St | propose alteration & addition (horizontal & vertical) 1/f: install 1 bathrm, family rm & 2bed rms. 2/f: install 2 bath rms,2 bedrm. remodeling kitchen & living rm. 3/f: install 1 beth rm, 1 bed rm. covert (e) attic floor to play rm.Details
propose alteration & addition (horizontal & vertical) 1/f: install 1 bathrm, family rm & 2bed rms. 2/f: install 2 bath rms,2 bedrm. remodeling kitchen & living rm. 3/f: install 1 beth rm, 1 bed rm. covert (e) attic floor to play rm. | $200,000 |
| Sep 28, 2011 | Completed final sign-off Apr 2012 | 1875 17th Av | proposed remodel of existing kitchen, bath, relocate interior stairs, cover light court with skylight at 2nd fl, add new bath 2nd fl, install 2 bedrooms,1 full bath,hallway, replace windows rear gr flDetails
proposed remodel of existing kitchen, bath, relocate interior stairs, cover light court with skylight at 2nd fl, add new bath 2nd fl, install 2 bedrooms,1 full bath,hallway, replace windows rear gr fl | $38,000 |
| Oct 5, 2009 | Completed final sign-off Jan 2011 | 2160 36th Av | proposed alteration & vertical addition to (e) building on new 3rd floor, 2 bathroom, 3 bedrooms on (e) 2nd floor. add 1 bathroom, remodeling kitchen & (e) bathroom, bedrooms, living room & dining room on (e) 1st floor. add full bathroom, add bedroom & family room (garage area)Details
proposed alteration & vertical addition to (e) building on new 3rd floor, 2 bathroom, 3 bedrooms on (e) 2nd floor. add 1 bathroom, remodeling kitchen & (e) bathroom, bedrooms, living room & dining room on (e) 1st floor. add full bathroom, add bedroom & family room (garage area) | $180,000 |
| Aug 17, 2007 | Completed final sign-off Nov 2007 | 2420 Jones St | remodel kitchen & bathroom (replace kitchen cabinet, sink, counter top, floor tiles & bath's fixtures & tub & cabinet)Details
remodel kitchen & bathroom (replace kitchen cabinet, sink, counter top, floor tiles & bath's fixtures & tub & cabinet) | $10,000 |
| Jul 18, 2007 | Completed final sign-off Oct 2007 | 4300 Anza St | unit #3 @ 2/f: interior remodeling, install new furnace, remodel kitchen, bathroom. install new lighting, add new 5/8" gpy.bd. type 'x' at walls.Details
unit #3 @ 2/f: interior remodeling, install new furnace, remodel kitchen, bathroom. install new lighting, add new 5/8" gpy.bd. type 'x' at walls. | $25,000 |
| Jul 5, 2006 | Completed final sign-off Feb 2008 | 375 Crestlake Dr | horizontal addition: proposed rear side addition at ground & 2nd floor. (install bathrooms & bedrooms, computer room)Details
horizontal addition: proposed rear side addition at ground & 2nd floor. (install bathrooms & bedrooms, computer room) | $50,000 |
| Jun 11, 2001 | Completed final sign-off Nov 2001 | 1642 Leavenworth St | remodel plumbing replace tub sink & toilet. rewire entire bathroom electrical.Details
remodel plumbing replace tub sink & toilet. rewire entire bathroom electrical. | $20,000 |