L & U Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2010 to Oct 2019
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2019 | Completed final sign-off May 2021 | 236 Country Club Dr | enlarge (e) fam rm & construct 1 full bath rm at ground flr. remodel (e) kitchen, bath rm & remove (e) powder rm at 2nd flr. rebuild interior staircase from 2nd flr down to ground flrDetails
enlarge (e) fam rm & construct 1 full bath rm at ground flr. remodel (e) kitchen, bath rm & remove (e) powder rm at 2nd flr. rebuild interior staircase from 2nd flr down to ground flr | $72,000 |
| Jun 11, 2019 | Completed final sign-off Aug 2020 | 45 27th St | convert (e) half bath to full bath on 2nd fl. add a full bath on 2nd fl and remodeling a (e) bathroom and kitchen. remove existing fire place. no work on (e) 1st floor.Details
convert (e) half bath to full bath on 2nd fl. add a full bath on 2nd fl and remodeling a (e) bathroom and kitchen. remove existing fire place. no work on (e) 1st floor. | $30,000 |
| Apr 13, 2018 | Expired or cancelled cancelled Feb 2021 | 346 01st St | unit 109: remove kitchen cabinet & countertop, no structural work.Details
unit 109: remove kitchen cabinet & countertop, no structural work. | $1,000 |
| Dec 22, 2017 | Completed final sign-off Nov 2018 | 481 Princeton St | alteration to the second floor interior kitchen and bathroom including but not limited to replacing a bearing wall with a beam and the upgrade of electrical.Details
alteration to the second floor interior kitchen and bathroom including but not limited to replacing a bearing wall with a beam and the upgrade of electrical. | $20,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 1837 16th Av | remove & repair the existing concrete step walk way on teh south side of the property. no changes to existing grade & size.Details
remove & repair the existing concrete step walk way on teh south side of the property. no changes to existing grade & size. | $1,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 1407 14th Av | dryrot repair on the front of the property. refinish with the in kind stucco. less than 50% repair from front wall.Details
dryrot repair on the front of the property. refinish with the in kind stucco. less than 50% repair from front wall. | $4,000 |
| Aug 1, 2017 | Completed final sign-off Oct 2017 | 1837 16th Av | remove & replace roted stucco molding (south side of prop), repair cracks on kitchen & dining room ceiling. primie & paint. approx 100 sq ft area.Details
remove & replace roted stucco molding (south side of prop), repair cracks on kitchen & dining room ceiling. primie & paint. approx 100 sq ft area. | $2,000 |
| Aug 1, 2017 | Completed final sign-off Jan 2018 | 1407 14th Av | remove & replace rot siding on ledt & right side and rear. approx 300 sq ft. prime & painting.Details
remove & replace rot siding on ledt & right side and rear. approx 300 sq ft. prime & painting. | $2,000 |
| Apr 15, 2013 | Completed final sign-off Jun 2013 | 776 05th Av | unit #2 - repair crack walls, prime & paint, remodeling existing kitchen & bathroom, replace existing window with in kind at rear.Details
unit #2 - repair crack walls, prime & paint, remodeling existing kitchen & bathroom, replace existing window with in kind at rear. | $3,000 |
| Jan 13, 2012 | Completed final sign-off Feb 2013 | 27 Melra Ct | to comply with complaint #200926886 to legalize rooms in 1st floor. to have one guest room, exercise room. a full bath for single family use only.Details
to comply with complaint #200926886 to legalize rooms in 1st floor. to have one guest room, exercise room. a full bath for single family use only. | $32,000 |
| Aug 16, 2010 | Completed final sign-off May 2011 | 89 Tiffany Av | interior renovation : in 1st floor: to add a bedroom, a bath, stroage rooms & relocate powder room, in 2nd floor: to close central court, add a bathroom & remodel (e) bathroom & kitchen.Details
interior renovation : in 1st floor: to add a bedroom, a bath, stroage rooms & relocate powder room, in 2nd floor: to close central court, add a bathroom & remodel (e) bathroom & kitchen. | $100,000 |