Permit GraphShortlistSan Francisco building permits since 2000

L M Construction

Contractor license
876867
State license record
Based in
Petaluma
On San Francisco permits
Mar 2010 to Mar 2018
Last 24 months
0 permits filed

10 permits since 2000: 10 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllDeck 1Kitchen remodel 1Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 167 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 30, 2010Completed
final sign-off Sep 2010
170 Eucalyptus Dr1. remodel (garage) lower level powder room into bathroom; 2. remodel upper level bathroom into two bathrooms; 3. replace exterior siding.
Details
Permit
201003309208
Status
complete
Filed
Mar 30, 2010
Permit issued
Mar 30, 2010
Final sign-off
Sep 13, 2010
Declared cost
$35,000
Address
170 Eucalyptus Dr

1. remodel (garage) lower level powder room into bathroom; 2. remodel upper level bathroom into two bathrooms; 3. replace exterior siding.

Open the permit page

$35,000